The quote for a topographic (aerial photogrammetric) survey
Why I call a quote a technical and financial offer, how I structure it chapter by chapter, and how I answer the question: can you give me a quote?

Article from 2019, revised in 2026.
The survey market changes fast: instruments, rules and prices are no longer what they were when I wrote it.
I’ve updated the outdated references, especially those on drones.
The reasoning about how to build an offer, on the other hand, hasn’t changed.
In this article I want to talk about what I mean by the quote for a topographic survey.
Why I like to call it a “technical and financial offer”.
Why it matters.
The time and care it deserves.
And why I always shudder a little at the question: “Can you give me a quote?”.
The quote (for a survey)
You probably know this already, but I’ll write it again.
A quote is a document in which someone tells you how much a service you’ve asked for will cost.
They write it before actively doing anything, so that you have all the information to decide whether or not to give them the job.
And they write it (rather than telling you) so there’s a record of the price, in case of disagreements when the job is done.
Because sometimes the quote also works as an agreement between the parties.
A quote applies to both works and services.
The plumber, the electrician or the building firm gives you one.
So do the accountant, the marketing consultant or the designer.
And the surveyor!
We also give quotes for surveys our (potential) clients ask us for.
Clients who may well have asked other professionals for quotes too.
That’s legitimate!
In fact, it’s normal practice to find the best offer and, where possible, save money.
It isn’t just about price
I believe a quote should put whoever receives it in a position to:
- understand how the work will be done;
- know how long it will take once started;
- know what will be delivered at the end;
- know how much it will cost.
In the specific case of a topographic survey (or a technical service), points 1, 2 and 3 aren’t always that clear and explicit.
And this affects the client’s decision, leaving price as the only criterion.
It isn’t just about price.
People who commission a survey often don’t know the techniques actually used in the field.
Or in processing the acquired data in the office.
They don’t have to.
It isn’t their job.
They care about getting a result.
But it isn’t a race where everyone runs the same course and the finish line is the same for all.
You can use different technologies.
There can be more than one route.
And the results can have different nuances too.
A practical example
If you’re asked, very generically, to survey the line of a road, you could opt for:
- a GNSS survey with a receiver in NRTK mode, measuring the coordinates of the minimum number of points needed to describe the road;
- a total station survey (total station + prism), which again gives the coordinates of the points needed to define the road;
- a drone aerial photogrammetric survey generating a point cloud of the road and a high-resolution orthophoto to support the CAD plan;
- a terrestrial laser scanner survey capturing all the points of the road and its surroundings (buildings, rock faces, trees, …).
Let me highlight some aspects of each of the four options I’ve just listed, in the same order.
- you can work alone and have georeferenced data; the instrument isn’t cheap and you get discrete points, though there isn’t much processing back in the office;
- unless you have a robotic total station (which costs as much as a car) you need someone to help you; precision is very high (mm vs cm), the points are still discrete, and if you want to georeference them you have to do some extra work in the field;
- the cost of the equipment starts to weigh more (drone, certificates, registrations, insurance and so on + photogrammetry software + surveying instruments for the control points), but you can work alone and deliver a 3D point cloud (with a high density of information) and an orthophoto, useful for 2D CAD drawing; the processing time isn’t negligible;
- the result is a high-precision 3D point cloud that also includes plenty of other things around the road, but a terrestrial laser scanner is fairly expensive compared with the rest.
How could they all cost the same?
Experience, qualifications, investments…
Instruments, staff, time…
You can’t get the same price for these four services.
But if you don’t give the person judging the tools to do so knowingly, the only criterion left is price.
It can’t be otherwise.
If you explain what lies behind the work you’re proposing, things could go differently.
The client might realise that a georeferenced orthophoto of the road would be very useful for finding, with good accuracy, the coordinates of manholes and drains too.
“I’ll go for drone aerial photogrammetry.”
Or they might need millimetre-level heights spread over the road surface to study surface rainwater runoff.
“I’ll go for the total station survey.”
And what if they found it useful to have, in a point cloud, the buildings along the road to support a new street lighting project?
Then “I’ll go for the laser scanner”.
But if, all things considered, a drawing of the road made from discrete points with centimetre precision is more than enough, and they’d rather save on the price, then “I’ll go for the NRTK GNSS survey”.
It’s a rough and rather simplistic example, but I hope I’ve got the message across.
Explain what you intend to do and give as much information as possible to whoever has to choose.
Along the same lines I wrote a similar article some time ago on the technical report of a survey.
You’ll find it at this link.
There too I wrote about explaining as much as possible of what you’d done during the work.
Although the themes, tone and content are similar, this article comes a bit earlier in time.
It’s about writing a quote for a topographic survey.
And since my work is mainly photogrammetry (which accounts for 80% of my quotes), this article focuses a bit more on the quote for a photogrammetric topographic survey.
But I hope it can also give ideas for other kinds of topographic survey or, why not, for other professional technical services.
Technical and financial offer
That’s what I like to call it: a “technical and financial offer”.
I offer you (that’s the offer) my services, explaining what I’ll do (that’s the technical part) and telling you how much it costs (that’s the financial part).
No public procurement
I want to make this clear: this article doesn’t refer in any way to public procurement procedures.
There the dynamics are different.
They depend on the value of the contract.
Sometimes there are tenders.
Other times offers are requested from professionals on the authority’s own lists.
In other cases still, direct awards are possible.
Either way, how the quote is handled can be distorted.
I don’t intend to go into that.
And I wanted to make this point clear.
Chapters vs bullet points
I think it’s much more effective to structure an offer in chapters rather than as a list (bulleted or numbered) of services.
I know, it takes more time.
It resembles a technical report, which is a more complex and structured document.
But nobody stops you making templates and using the revolutionary technique of the digital age: copy and paste.
And I also know it takes the recipient more time to read.
Then again, if a choice has to be weighed up to get the best from the bidder, I think it’s right to spend a few minutes reading it properly.
Otherwise we’re back to square one: we choose on price.
Chapters with clear titles break up the “wall of words” and make reading less heavy.
I usually use these:
- INTRODUCTION
- SURVEY AREA
- SURVEY TECHNIQUES
- RESULTS
- PRICE AND TIMESCALES
- TECHNICAL NOTES
- …
- …
Each chapter can have one or more subsections.
Feel free to use as many as you need.
And there can be others too.
Just as all of them might be too many.
I think the goal to keep in mind is to be clear and direct.
Every unclear point risks becoming something to discuss and look into further.
And looking into things takes time.
If you can spare the reader of the offer (who can give you the job) some “extra wasted time”, you’re doing them a favour.
Time is the most precious resource we have.
I suggest using simple language.
Don’t use jargon.
Don’t worry about the flourishes of formal writing.
Avoid them.
The goal is something else: to be understood by someone who doesn’t know the subject.
I’m not saying write like a primary school essay, but don’t write ten-line sentences worthy of a nineteenth-century novelist without a full stop either!
Introduction
The introduction is the abstract of the offer.
It’s a few lines with a super summary of the document’s content.
You might decide not to include one.
It depends on the job.
I like to include it, because it’s a bit like introducing yourself!
🙂
I say what I’ll do, where, why and how.
Survey area
Describe WELL what is to be surveyed.
Start with the administrative part, going from the specific to the general:
- Locality;
- Hamlet;
- Municipality;
- Province;
- …
And then identify the subject of the survey in detail:
- what it is;
- what it’s like;
- how big it is;
- what it’s bounded by;
- what the minimum and maximum heights are (if relevant).
Include images from Google Earth, photos from site visits, or extracts of technical or cadastral maps available in online databases or archives you have access to.
I know it depends on the subject of the survey, but try to be as precise as possible.
It’s in the interest of both the reader and the person doing the work.
If the quote also works as an agreement between the parties, nobody can argue that another area should have been surveyed too.
Just as the surveyor will have to answer for not delivering an area included in the offer.
In complex cases, such as the slopes of a ski area, you could even prepare a drawing attached to the offer, overlaying a Google Earth image on the regional technical map and defining the areas to be surveyed clearly and unambiguously in plan.
Have it signed for acknowledgement.
If instead you’re modelling a building, specify whether it will include all the façades and the roof too.
Or only part of the structure…
For a road, locate the start and end of the route, being clear about any strips to the left and right of the carriageway.
Clarity and lack of ambiguity start with defining the areas and objects to be surveyed.
Survey techniques
This is the longest and most detailed chapter of the whole offer.
It contains the description of:
- the operational choices;
- the equipment and instruments;
- the techniques and methods of the fieldwork;
- the data processing;
- and the expected results.
I’ll share what I write in this part for an aerial photogrammetric topographic survey.
Why an aerial photogrammetric survey
It can’t be taken for granted that everyone knows photogrammetry and how it works.
Nor aerial photogrammetry with drones.
In this part I describe briefly (very briefly) how a photogrammetric survey works (photos + survey measurements + data processing + delivery) and list the reasons for choosing this technology.
Despite lower precision than other surveying techniques, there could be interesting advantages that tip the balance in its favour:
- access to dangerous and/or inaccessible areas with a drone;
- a 3D output;
- a photographic record;
- orthophotos and digital elevation models.
After presenting the method, I describe the instruments and the operational phases.
Drones and the rules of the air
If I use a drone, I give the details of the operator and the pilot:
the UAS operator registration code (in Italy you get it on the D-Flight portal), the pilot’s certificates and the category the operations fall into, with any declarations or authorisations if they fall outside the Open category.
I think it’s important for the reader to know that whoever is offering the service is “in order” with the bureaucratic and administrative side.
The rules are those of the European Regulation (EU) 2019/947, in force since 31 December 2020, and they change often: always check the ones in force with your national aviation authority.
UAS geographical zone maps let you know (more or less) straight away whether an area can be flown or not, or whether special authorisations are needed.
In Italy you’ll find them on D-Flight.
I always include an extract of the map with the work area.
If there are restrictions in the area (prohibited zones, areas near airports, …), it’s important to say what they mean for the planned operations and how you intend to request the necessary authorisations.
Instruments 1 – Photos
A few lines listing the characteristics of the camera (or cameras) I’ll use:
- sensor size;
- resolution (megapixels);
- lens.
Why?
Again, for clarity.
Because if your client tells you they expected 100-megapixel photos from a medium format sensor, you can tell them your equipment doesn’t do that.
But also because if you send photos taken with a 2010 smartphone when you’d written you’d use a 40-megapixel full-frame DSLR, you deserve to be told off!
Instruments 2 – Measurements
Since photogrammetry combines photos and precise measurements, in this part I describe which measuring instruments I use to support the “structure from motion” process.
I talk about the GNSS receiver (type, constellations, mode of use: NRTK, base-rover, static + post-processing).
Just as I introduce (if needed) the total station for measuring points that can’t be reached on foot.
Nothing stops you mentioning laser distance meters or scale bars of known length, if you have to model an object photographed under the controlled conditions of a studio.
I think the important thing is to get across that the surveying part hasn’t been forgotten.
It’s the most important part, the one that makes your 3D model robust.
And since it isn’t rare to hear of photogrammetric surveys done without measuring ground control points (GCPs) and check points (CPs), it’s good to show you have the tools of the trade!
This part on measuring instruments matters for other kinds of survey too.
If you have to monitor a tunnel, writing that you have a total station with 1″ angular precision is far from superfluous.
Quite the opposite!
Describe what you’ll do in the field
Now it’s time to describe your actions in the field.
Start with the site visit: why you do it and what information you’ll get from it.
Then move on to planning the field operations:
- Managing traffic, access and keeping people out of off-limits areas;
- Choosing the Ground Sampling Distance (GSD);
- Automatic flight missions or manual flight;
- Artificial ground targets;
- Ground Control Points;
- Check Points;
- Photography;
- Survey measurements.
But you don’t have to tell the whole saga.
🙂
It’s still a technical offer.
Don’t overdo the text, or the content gets diluted.
Describe everything to make the work you’ll do clear (the effort, the planning, the care), but don’t get carried away.
You’ll have all the space of the technical report to enrich the story.
The aim here is to be clear and direct.

Data processing
If the field part is important, so is explaining what has to be done back in the office.
If only to shed light on the photogrammetric process.
And to make it clear that photogrammetric results are a matter of days, certainly not hours.
I explain, broadly, how the phases of structure from motion processing are organised and what comes out of them.
And I say which software I use.
Point cloud processing is a phase that can take a lot of energy and resources.
It’s often underestimated, but it’s these hours of editing that let you generate a DTM (Digital Terrain Model), classify the elements of the cloud and have an output (see the next point) that meets the requirements.
Sometimes it takes equally specialised software, with far from negligible licence costs.
I think it’s useful to spell out this step too.
Results
At this point you should write what kind of results you’ll obtain (and deliver) as output.
The description of the deliverables should match the (potential) client’s requests.
But you could add products you think would be valuable to them.
Explain the products, starting from the most complex.
I start with the point cloud, describe the file format and include links to point clouds available online as examples.
PDFs keep external links!
Over time I’ve found that showing a point cloud is a thousand times more effective than trying to describe it.
Will you deliver the raw cloud, the cleaned cloud, the subsampled cloud, the classified cloud?
Will you upload it online for remote viewing?
You may also be asked for the 3D model, mesh + texture.
Will you deliver an OBJ file, a DAE file or another format?
Will you upload it online so it can be viewed remotely too (I use Sketchfab)?
What resolution will the texture have?
Let’s move on to 2D data.
First the 2.5D ones.
Will you also deliver a digital elevation model?
A DSM or a DTM?
What’s the grid size of the digital model?
Now the orthophoto.
What resolution does it have?
Will you deliver a nadir one, or also orthomosaics on different projection planes?
How many?
If you deliver a vector plan, say something about that too.
What’s the drawing scale?
Do you have to produce a spot height plan? On what grid will the points be delivered?
Will you generate contour lines? At what interval?
Accuracy
Don’t forget to state the accuracy with which you’ll deliver your results.
I wrote an article on accuracy and precision, which you can read at this link.
But, just to say something here too, it’s a value that tells you how far the delivered position of a point is from its position as surveyed in the field.
Saying you’ll deliver a survey with an accuracy of 2 mm, 3 cm or 50 cm is saying three very different things.
It’s important for the reader to know what to expect.
Because on the basis of your data they will or won’t be able to make choices and decisions in their own work.
You don’t need to be Swiss-watch precise in this statement.
If you know you’ll confidently deliver data at 8 cm, you can write that your accuracy will be 10 cm.
It’s better to be cautious without distorting the result.
Don’t write that you’ll deliver millimetre accuracy if you’re doing an aerial photogrammetric survey with a Phantom 4 at 50 m, surveying the control points with a GNSS receiver in RTK mode.
You can’t do it!
🙂
Georeferencing
And finally there’s the georeferencing information.
It isn’t always needed (for me it is, but I know that isn’t the case for everyone).
Stating the output reference system of your work shows awareness of a subject many find a bit obscure: coordinates and reference systems.
If you haven’t received precise instructions, I suggest stating a reference system you’re confident with and for which you’d avoid transformation errors (between datums) that would also affect the accuracy a little.
By default I deliver work in the Italian ETRF2000 (RDN2008) system, but I often leave the door open to delivering in reference systems specified by the client.
A quick thought on the data you plan to deliver.
There are the client’s needs, which must be met, and then there may be extras you choose to provide.
But be careful not to overdo it.
Don’t go overboard!
Don’t show off!
🙂
If you’re asked for a spot height plan with points 2 m apart, and you also propose the point cloud, the orthophoto, lots of sections every metre, the digital elevation model and contour lines at 20 centimetres, you’ve overdone it!
The price for all that is obviously higher than for a normal spot height plan.
And probably too high to win you the job.
You’d blow the available budget.
If instead the price is the same as for a spot height plan done with NRTK GNSS, then allow me to say it’s an unsustainable price for the services you’re offering…
Price and timescales
Speaking of price!
At this point comes, at least in my offers, the quantification.
How much it costs.
How long it takes.
Price
Well, there isn’t much to say about price.
Or perhaps there is something.
You have to write how much everything you’ve offered costs.
I write it in figures and in words.
I’m not sure it makes sense, but two years in the public sector (I worked at a regional park authority right after graduating) installed some habits in my brain that I struggle to delete.
This is one of them!
One risk with writing figures and words is that, if you copy and paste (and you can!), you might update one and not the other, creating confusion.
If you want to be safe, use figures only.
But don’t forget to specify whether the price:
- includes or excludes pension contributions (in Italy, engineers’ fees carry a 4% contribution to their pension fund, Inarcassa);
- includes or excludes VAT (and if it excludes it, how much it is);
- includes or excludes any expenses incurred to do the job (if it doesn’t include them, specify them).
Timescales
Timescales are an important part, but often forgotten.
Knowing whether what I need will be delivered one day or one month after the end of the survey could make a huge difference to the choice.
If your client is in a hurry, they may be willing to spend more to guarantee a faster delivery.
And, on the other hand, with this detail you can avoid phone calls like: “is everything ready?” two days after the survey, especially if you wrote “delivery after 30 days” in the quote.
I usually state timescales like this:
- site visit and planning of the fieldwork, within XX days of the appointment;
- the fieldwork will last XX days and will start no later than XX days after the site visit;
- the data will be delivered within XX days of the end of the fieldwork.
You can add partial deliveries or anything else that helps your work and the client.
Or you can drop the site visit, if you’ve already done it.
In short, adapt it as you like.
Take what I’m writing as a general, very personal, guideline.
Validity of the offer
Writing this part isn’t trivial either.
Yet, simple as it is, it could save you hassle or loss-making jobs.
The sentence is this:
This technical and financial offer is valid for XX days from the date of this document.
XX can be 30, 60, 90, …
Up to you.
This way you keep your work sustainable if the decision isn’t immediate.
To be honest, I’ve never had anyone call me back two years after an offer to do that job.
But never say never…
If between now and two years from now you change equipment, grow your business or anything else, you have to load different (probably higher) fixed costs onto your price, and that job might no longer be economically sustainable.
It’s a single line, but it can help!
Technical notes
At the end of the offer I always add some technical notes to explain certain critical aspects of the work better.
The typical notes I add concern:
- the passive nature of photogrammetry;
- the dependence of operations on the weather;
- any operational/regulatory aspects of using drones.
Even though it’s a professional’s ethical duty to know the limits of their techniques and instruments and not take jobs they can’t do, it’s still useful to restate them.
Knowing that an aerial photogrammetric survey over woodland delivers nothing but the tree crowns (and not the ground underneath) can be very useful information for a reader (who doesn’t know photogrammetry).
Likewise, pointing out the limits of flying a drone in the rain or taking photos in the Po Valley with fog on the ground.
Better to be clear about this too!
Exclusions
If you want to avoid being asked for further, fairly costly services (in terms of time and resources), you can add a specific chapter on exclusions.
I think you should try to be reasonable here and not lock the job down to exactly what’s written, word for word, in the description of the services.
If you’re asked for an extra point cloud with greater decimation, it’s no bloodbath!
CloudCompare’s Subsample command does it in a few seconds.
Do it!
If instead a rendering is requested, well, that’s different…
Exclude what is, objectively, a significant commitment for you and your resources.
Payments
Agree how and when payment will be made.
As for how, I’d say bank transfer is now accepted and common to most.
But there may be other ways.
As for when, spend a few lines on it:
- payment in advance;
- deposit + balance on delivery;
- payment at the end of the fieldwork, before the results are delivered;
- payment on delivery;
- payment at 30, 60, 90 days.
These are all possible options.
I think they should be weighed up according to the client.
And their habits when paying suppliers.
I’m in favour of payment in advance, but in Italy that’s pure utopia.
If you’re quoting for a large company that pays its suppliers at 90 days, unless the situation is very particular, there’s not much point asking for payment on delivery of the data.
You’re unlikely to get it.
This is a subject that could open a post within the post.
I’ll stop before that…
🙂
The quote as an agreement between the parties
If the amounts of the offer aren’t high (I know, “high” is very subjective), I use the quote as an “agreement between the parties”.
I don’t draw up a contract after acceptance; I refer to the content of the offer.
Write that down.
Now you just have to add the date and signature.
🙂
Can you give me a quote?
A few years ago, at the beginning of my journey with 3DMetrica, every time I heard the question “Can you give me a quote for a survey of …?” I was delighted!
I’d devote myself zealously to putting together complete, rich technical and financial offers, with the content I’ve just described in this article.
I often did the necessary site visits too!
But then, doing the maths on jobs won against quotes sent, I realised I’d spent a sea of time on it.
And I stopped doing it that way.
Some people have “quote request syndrome”.
They ask for formal quotes even to get a haircut.
And I’ve met them.
Others ask for quotes with not entirely noble motives: competitors (I don’t like the word, but it gets the idea across) sounding out the market, or others who take the content of your offer and put it in their own tender for services.
As I write this post, when I get the cold question (i.e. from a new contact I’ve never met): “can you give me a quote?”, I no longer rush to write one.
Time is the most precious resource we have (I think I’ve already written that 🙂).
The reader’s, but also the writer’s.
What I do is get the job explained as well as possible (by email, phone call, photos or Google maps), make a rough estimate (tending on the high side, to absorb all the possible fluctuations that come from specifying the activities) and write an email saying:
“Thanks for your request. Based on what we’ve discussed and what I’ve been able to look at so far, my work costs XXXX euros.
I’ll do it using this technique and deliver these data to you.
If your budget covers the figure I’ve estimated and the technical solution I’ve proposed suits you, I can prepare a detailed offer, and if possible you’ll need to give me some more specific information so I can best meet your needs.”
This way:
- I spend little time on “weak” requests;
- I give a rough indication of the price, which at first is the most important piece of information;
- I cut out the “over budget” ones, answering them with full knowledge.
If you ask for 1,000 from someone with a budget of 100, they very probably won’t ask you for a formal offer.
It’s happened to me only once.
I received a request for a fairly major survey of a rocky headland along a road.
After my reply, along the lines of what I’ve just described, I got another saying the budget was 70% of my proposal.
Still informally, I replied that for that budget I’d do the job by reducing the survey area to the most critical parts, attaching indicative maps.
I got a reply saying that, to proceed with the assessment and award, a formal quote was needed.
I did it, with all the trimmings I’ve described.
And then silence…
🙂
That case aside, the informal approach with a budget indication works well and wastes nobody’s time.
If the relationship goes ahead and there are no major changes in techniques, areas and deliverables, it’s good practice not to exceed the initial figure or, if anything, to lower it.
I hope this post gives you some ideas on how to approach the quote for a topographic survey.
Oops, I mean a technical and financial offer!
🙂
I want to repeat that what I’ve written is just a share of what I do.
It isn’t law (heaven forbid!).
Nor a rigid guide.
Quite the opposite!
I’d like it to become a starting point for discussion.
If you like, write to me and tell me about your experience.
Both as a writer and as a reader of quotes!
Thanks for your time and attention!
See you soon!
Paolo Corradeghini
P.S. A spreadsheet to estimate the quote for a survey
To estimate the cost of a survey, even at an early, informal stage, I use a fairly detailed spreadsheet that I built and have adjusted over time, based on my experience.
The spreadsheet is available at this link for 3DMetrica’s supporters on Patreon.
I chose to reserve some extra material for supporters, to thank them for their precious support.