IT

Photogrammetry and drones · Projects · 21 October 2020

Morandi Bridge (Part 1): photogrammetric surveys and 3D models of the last piers

The 3D photogrammetric survey of piers 10 and 11 of the Morandi Bridge in Genoa before their controlled demolition, the day of the blast and the survey of the rubble.

I don’t remember ever being under the old “Morandi Bridge”.
Not even when I used to go to Genoa’s many swimming pools for swimming races and water polo matches.
I had driven over it many times, though, before 14 August 2018 (the day the bridge collapsed).

The first time I went under it was on 13 June 2019, during a site visit to plan the three-dimensional survey of piers 10 and 11 of the old structure.
On Friday 28 June 2019 they would be demolished with a controlled explosion.

Morandi Bridge: the deck from below, between the buildings of Via Fillak

This is the first of a few articles about my experience in the demolition of the Morandi Bridge and the construction of the new Genova San Giorgio bridge.

It’s a story that lasted more than a year.
It was wonderful, challenging, sometimes moving, at times very stressful and often tiring.
And like every story, it taught me something.

In this chapter I’ll tell you about the photogrammetric survey of the old piers (and pieces of deck), before and after their demolition.

With a short interlude during (the blast).

An external assignment

I did all my work on the new bridge site on behalf of RINA (specifically RINA Consulting and RINA Services).

For this project RINA handled all the project management, works supervision and safety coordination, both in the demolition phase and during reconstruction.
RINA worked very closely with the Commissioner for the reconstruction (Marco Bucci) and the whole staff of the Commissioner’s Office, as well as with the contractors on site: the demolition firms first, then the builders.
To do all this, which was anything but trivial, it relied on in-house resources and external collaborators.
I was one of them.

As a Ligurian and as an engineer, I’m very proud and happy to have made my (small) contribution to this project.

Thanks in advance

Usually thanks come at the end.
But sometimes not everyone reaches the end of a (long) article.
So I want to thank, first and foremost, Cinzia Pica of RINA.

She introduced me to the site, explained it to me and accompanied me through every stage of this adventure.
She always trusted my work (even in some delicate situations), listened to proposals and embraced ideas, proposing her own, in a very collaborative dialogue that was never a subordinate “client to contractor” one; she solved problems and worked with great professionalism and dedication.

She handled technical and communication aspects, introducing “new” analysis tools and methods on such a complex site, without sparing her weekends, Christmas, New Year, Easter, the August holidays…

There are other people I’ll thank in this article, but I’ll do it as I go.
This one, though, I wanted to do straight away!

A necessary premise

Nobody (I hope) forgets what happened on 14 August 2018.
I remember well where I was when I heard the news of the collapse.

First of all there are the victims of the disaster and their families.
Then there are the investigations, the responsibilities and tonnes of online discussion.

In this (and the next) articles you won’t read any of that.
Not because I’m not interested or it isn’t important.
It is, very.
But because I want to tell you about the technical work I did on this site, highlighting the critical points and difficulties and talking about the results.
The same way I would for any other site.

Was this site different?
Without a doubt!
But in the end every situation is different from the others.

I don’t forget what happened.
But I won’t bring it up again here…

The 3D model of piers 10 and 11 of the former Morandi Bridge

The first phase of my work was the 3D survey of the old piers 10 and 11 of the Morandi Bridge, still standing, before their demolition.

After that (but still in the first phase) came, again, the 3D survey of their rubble after the blast.
We’re in the eastern area, right next to the stretch of the A12 motorway leading to the Genova Ovest exit.

In both cases I used photogrammetry, taking images (mainly) from a drone and (some) from the ground, taking survey measurements and mixing everything together in “structure from motion” software.

Morandi Bridge - drone aerial photo of former pier 10 before demolition

I can tell you little about why this kind of survey was needed.
These were decisions of the Commissioner’s Office, in support of the Public Prosecutor’s Office, also linked to the (many) investigations carried out over time.

There was a need for a digital record of that part of the structure, always “inspectable” and queryable, before it disappeared for good, and also for support for qualitative and quantitative analyses of the dynamics of the collapse, as well as for giving the go-ahead for machinery to enter the site.

I don’t have much more information.

Tight deadlines and no margin for error

Tight deadlines marked almost every operation on this site (not just mine!), unique in its kind and in its context.

These surveys were no exception.

Morandi Bridge pier 10 next to the houses and above Via Fillak

I had only one day for the surveys of the existing state.
20 June 2019.

In the following days the site areas would be progressively and irrevocably closed, because the explosives experts would start loading the structure with charges and rigging the “fuses”.
It all culminated in the TOTAL evacuation of all the homes near the bridge on the day before the blast.

This was the first time at work that I clearly felt the pressure of having no second chance.

If I get a survey wrong in a quarry, on a landslide or in another setting that won’t be radically transformed soon, I always have “Plan B”: I go back into the field and redo it.

OK, it should never happen, I lose time (and so money), but in the end the result always comes first, and knowing you still have an option, even an extreme one, gives you some peace of mind.

Not here.
It had to be “right first time”.
And that raised the tension a bit.

Morandi Bridge pier 10 seen from the deck looking west

I don’t mind working under pressure.
If you channel it and take the positive side, it works as a stimulus and the result can be very good.
I think having done a lot of competitive sport (even when no longer very young) and all the university exams of the old five-year degrees (semester courses with no intermediate tests) helped me manage “good” stress.

Aerial photogrammetry + photogrammetry

The technique I chose for these surveys was photogrammetry with images taken both from a drone and from a terrestrial camera.

Picturing the rubble on the ground after the collapse, I struggle to find a better technique than drone aerial photogrammetry.
Moving around wouldn’t have been easy, and many areas would have been inaccessible, partly because of physical and safety limits and partly because of specific bans by the competent authorities.

Surveying the standing piers might have been more effective with a terrestrial laser scanner.
But there were three problems with using one:

  • availability of the instrument at very short notice (at the time I hadn’t yet embraced laser scanning);
  • the need to work fast with no possibility of stopping all or part of the site to avoid interfering with the measurements;
  • the complete inaccessibility of some parts (the whole upper part of the A-frame structures and of the stays at each pier).

So I decided to use photogrammetry.

A drone would let me cover the hidden parts and capture the data in the field fairly quickly.
With a terrestrial camera I could go under the deck and piers and take photos looking upwards.

This would mean quite a lot of processing time.
I’d have photos from different sensors, to process separately and then merge.
I’d end up with a fair amount of noise and dirt in the point cloud, which I’d have to section and clean carefully and calmly.

Less time in the field very often means more time processing.
Every job has its own needs, which lead to operational choices.

There was no need for millimetre accuracy in the output.
5 cm would be enough, and the conditions were there to achieve it.

Surveying the standing piers

If you’ve already read other articles on this blog, there isn’t much to add to the other photogrammetric surveys described in these pages.

If you haven’t, it seems fair to give you a summary.

Ground targets

The first thing I did was place ground targets.
Across the whole site and in every accessible area.

Morandi Bridge survey: placing ground targets and GNSS measurements

The old bridge structure extended horizontally but also vertically.
So it was important to place targets not only at ground level but also on the walkable deck.

And so I did.
I placed disposable paper targets, 70×70 cm, printed on 100×70 sheets.
I chose paper to speed up field operations even more.
I wouldn’t have to collect them, and getting rid of them with the rubble of the collapse wouldn’t be a problem.

I surveyed the target coordinates with a GNSS antenna in nRTK mode.
Conditions for using a single satellite receiver in nRTK were excellent here.

  • The GPRS connection for receiving the differential corrections was strong and stable.
  • The view of the sky was just as good (as long as you didn’t go under the old deck).
  • The distance from the nearest permanent station (Genoa’s) was really short: less than 5 km.

The receiver was always in “fixed mode”, with very good precision for this kind of measurement: 1-2 cm horizontally and 2-3 cm in height.

Surveying the coordinates of 40 targets was quick!

Morandi Bridge survey - target on the access ramp and GNSS measurements

Manual flight

I took nadir, oblique, frontal and even upward-tilted photos.

While for the nadir photos there was some chance (actually little) of planning an automatic mission, for all the others there was none.

So I always flew manually.
I didn’t bother planning even the nadir photos.
The deck of the old Morandi Bridge was 45 metres above the ground.
The top reached 90 m above ground level.
And mission planning software doesn’t have this kind of information, since these are structures and not terrain (DTM).

Better to fly by hand.

It would take a bit longer, but I’d be surer of having all the photos needed for processing.

Morandi Bridge - aerial photo of the deck above pier 11

Adding terrestrial photos

Since I also had to model the “undersides” of the deck and piers, I added to the drone image dataset a series of photos taken with a terrestrial camera, moving on the ground and shooting mostly with my nose, and the camera lens, pointing upwards…

I took quite a few: under pier 10, under pier 11 and under the sections of deck, taking care to also frame areas covered by the drone survey, so I could join the 3D models from the two processing runs.

Morandi Bridge - photo of the deck from the Campasso level looking east

Data processing

I processed the field data with Agisoft Metashape Pro (Structure from Motion software), which takes photos and survey measurements and mixes them together to create 3D models that are oriented, scaled, geometrically robust and georeferenced.

You start with the tie point cloud, the sparse cloud, made of points common to the images, then move to the dense cloud, made of those same tie points plus lots of others recovered from the photos, and arrive at the 3D mesh, where the dense cloud points become the vertices of triangles forming a continuous surface.

I processed two separate models.
The main one was made from the drone photos, and I then joined to it the model of the undersides from the ground photos.

I must say a few holes remained here and there, especially under the A-frames and between the reinforced concrete beams.
However effective and fast it is, in some uses photogrammetry has objective limits.
The main one is that it is a passive technique: you can only build the 3D model of what is (clearly) visible in the images (and one isn’t enough, you need a few more…).

But overall the result was OK.

Agisoft Metashape - image alignment and sparse point cloud.

Cleaning the point cloud

Once I had checked that the captured data and the overall model were OK, I shook off some of the anxiety that the thing would soon no longer exist and I wouldn’t get another chance to survey it.

I had a few days to devote to cleaning the point cloud.
And I’d need them.

It wasn’t quick.

When you process a dataset of photos taken from various angles and viewpoints, you’ll probably frame things other than the structure, often far away.

Frontal or upward-tilted photos will certainly show the sky.
A structure “full of holes” will have parts on different planes and at various depths.

All this translates into some noise in the point cloud around the main structure.
Points buzzing like bees around a beam or a stay.
Or rather, around their reconstruction.

If there was a lot of sky in the photos, the noise points may be coloured blue.
Or green, if you photographed something with trees in the background.

Needless to say, this noise has to go.
First, because these points have nothing to do with reality.
Second, because if you leave them, the mesh surface, which is based on the dense cloud points, comes out a mess.

So you need to work a lot on the point cloud.

Point cloud software helps with some automatic algorithms (outlier and noise removal filters), but on their own they aren’t enough, and you need patient manual work, area by area and section by section…

I can’t share the interactive, inspectable and measurable 3D model of the standing piers.
I hope you’ll understand it’s a rather delicate matter….

What I can do is give you a screenshot of the 3D model below.

Morandi Bridge survey - 3D model of piers 10 and 11.

The day of the blast

I think everyone has seen the images of the explosion (controlled demolition) of piers 10 and 11 of the old Morandi Bridge.

If you’re one of the few who hasn’t, you can search YouTube for “Ponte Morandi esplosione controllata”.

The photo below is one of many on the web.

I won’t go into topics I know very little (if anything) about; I’ll just say it was an extremely delicate and complex operation, given the setting of the bridge structure and all the related critical issues.

The Municipality of Genoa, together with the Prefecture, Civil Protection, the Province and the police (and others I’m surely forgetting) evacuated a lot of people living within 500 m of the bridge, many hours before the blast.
And allowed them back only many hours after the end of the operations.

I did two things that (very long!) day:

  1. Drone video footage during the blast and in the moments after the collapse;
  2. A qualitative aerial photogrammetric survey of the rubble and how it lay on the ground.

Video footage and live streaming of the blast

The video was for the “control room”, from which the technicians and everyone in charge of the operations could follow what was happening in the field.

Thanks to the help of RINA’s highly specialised team (coordinated by Giovanni Gambaro, a great man and an outstanding professional, whom I thank warmly for coordinating complex activities at a very delicate moment, without ever showing or offloading onto others the inevitable tension of the moment), a dedicated live stream was set up for the footage.

I wasn’t alone.

With me was RINA’s drone, flown by Antonio De Lorenzo, invaluable throughout all my work at the bridge (including later on) because he was always in constant contact and coordination with Genoa airport’s control tower (the area was within the airport’s ATZ and a special no-fly zone set up by ENAC, the Italian Civil Aviation Authority, right after the 2018 collapse).

My thanks go to him too, for all the openings and closings (including later ones) of the controlled airspace.

Put like that, these operations don’t seem very complex: flight + video + streaming.

So here are some factors that complicated life a bit and raised the tension.

  1. The drones had to be in the air before the blast to get into position for filming, but we couldn’t take off too early or we’d risk running out of battery. We had a timing and a direct link with the operations coordination, but we couldn’t hesitate, be late or go too early.
  2. The take-off and landing area was on the roof of a building, right at the edge of the evacuated zone. I also had to allow for the time (and battery) needed to get back.
  3. In the control room, besides all the technicians following the operations, there were also some ministers and members of the Government, just to raise the pressure even more.
  4. Shortly before the demolition, the roof of the building where we had set up our post filled with onlookers who wanted to follow everything from a privileged position. So far (almost) OK, except that EVERYONE took out their smartphone to record a video and some to live stream it. This increased the local electromagnetic interference quite a lot (measured objectively with specific devices). Once in the air, while approaching the filming position, my Phantom lost its connection with the remote controller, interrupting the stream and returning home. Thanks to her decisive, timely and providential intervention, Cinzia Pica got everyone to switch their smartphones to airplane mode, stopping the data traffic and bringing everything back to “normal”.
  5. It was one of the hottest days of a hot summer, and we were on the roof of a building, surrounded by concrete and tar and under the sun (for several hours already…).
  6. The blast couldn’t be repeated. Mistakes weren’t allowed.

Everything went well: the footage, the streaming and, above all, the demolition.
The drones kept flying, taking turns, filming from above how the cloud of dust rising into the air evolved.

Genoa is often windy.
The Polcevera valley is always windy.
A real concern was the formation of a dense cloud that could drift up the valley or, worse, towards the sea, towards Genoa, towards the airport.
It was important to film it from above to keep it under control.

Fortunately the preventive systems to reduce dust after the blast (water tanks, cushioning mats and hydrants) worked well.
There was a cloud, but not a very dense one.
And the wind, blowing from the sea up the valley, kept it away from the seafront.

A couple of hours after take-off, the drone landed.
I downloaded the memory card (we also recorded the footage, not just streamed it) and took a break.

That was one of the most stressful, high-tension flights I’ve ever done…

Qualitative aerial photogrammetry of the collapsed rubble

In the afternoon came the second part of the planned operations: a flight for an aerial photogrammetric survey to generate a qualitative orthophoto of how the rubble lay on the ground.

The area was still closed and totally off limits (except for the technicians in the field measuring air quality).
I walked to the very edge of the accessible area.
From there I launched an automatic flight mission I had prepared shortly before with UgCS.

The drone flew at the limits of what was allowed, both in height and in distance from the pilot.
In fact, to be completely honest, it went a bit further (not much), but in good conscience I felt at ease, given that there was nobody within an area of at least 50 hectares!

I took nadir photos.
I processed them in the field on my laptop and produced an orthophoto on the spot.

It wasn’t georeferenced or precisely scaled.
But it was oriented and good enough to provide immediately a high-resolution map of how the rubble lay.
Laid out and printed on the spot.

At 8 pm I got home.
I had left at 5 am.

If I count the actual working hours (flights, footage, aerial photogrammetry, processing), it doesn’t reach 5.
But they were worth much more!
🙂

The day after: surveying the rubble

If the day of the blast was marked by a lot of operational tension, the day after was surreal.

We entered the rubble zone.
We had to survey precisely how it lay and create a 3D model.

The Commissioner’s Office needed it to provide quantitative, measurable and robust information to the bodies responsible for giving the green light to the demolition machinery to enter the site and start clearing.

Here too there was some urgency.

There were 4 of us: me, Cinzia Pica, ever present, and two Antonios.
Antonio De Lorenzo, coordinating the flights, and another Antonio (whose surname, alas, I don’t remember) managing safety.

Boots, helmet, mask (used long before the Covid era!) and safety clothing, because the absence of asbestos dust hadn’t yet been confirmed (it was confirmed very shortly after).
And, again, lots of heat.

Morandi Bridge demolition - rubble seen from east to west the day after the blast

The planned survey was a photogrammetric capture with structure from motion processing.
Ground targets, GNSS measurements and drone flights.

Here taking the photos was much simpler than for the standing piers.
Most of the photos were nadir.
That was the most meaningful view.
And I added a few oblique images here and there for the parts that stuck out a bit more from the ground.

I used a GSD of 2 cm/pixel.
I didn’t take very close-up photos.
I could have.
I had the time and the area wasn’t very large.
But I had to reckon with processing times, and too many photos wouldn’t have allowed the quick delivery I’d been asked for.

Survey of the Morandi Bridge rubble - ground targets for the GNSS survey

I got back to base at 4 pm on Saturday afternoon.

I immediately launched the image alignment, processed the satellite measurements of the targets and fixed the sparse cloud with the target coordinates.
Then I started processing the dense cloud.
On Monday I checked it, cleaned it a bit (much less thoroughly than the model of the standing piers) and delivered it in the early afternoon.

Again, I can only share a screenshot of the 3D model.

A “surreal” situation

What was strange about this work was the setting.
Silence, rubble, hydrants still spraying a bit of water…

Via Fillak - Genoa - after the blast of piers 10 and 11 of the Morandi Bridge

I don’t know what a war scene is like.
And I don’t want to disrespect anyone.
But maybe it wasn’t so different from this.

Morandi Bridge demolition and rubble between the buildings

Shortly after, that same morning, the various experts would enter the site to inspect the blasted structure visually and make their assessments.

For a while it was just the 4 of us, the rubble and the silence, broken now and then by the wind moving the torn protective sheets.

Rubble after the demolition of the Morandi Bridge

In the following days the areas would be released from seizure and the clearing would begin.

I really believe the deafening silence of that morning will never be heard again in that part of the Polcevera valley…

Rubble after the demolition of the Morandi Bridge and buildings along Via Fillak

So, that’s the story of the first part of my work in Genoa.

From then on, for the whole construction of the new Genova San Giorgio bridge, I went back many times for aerial photogrammetric surveys of the site areas, to support the decisions of the works supervision and safety coordination.

But I’ll tell you about that in another article.