This article tells the story of the survey of a marble quarry in the Carrara extraction basin, for the annual update of the site to be submitted to the (Tuscany) Region.
It is an integrated survey in which I used several instruments: GNSS, total station, laser scanner and drone photogrammetry (which isn’t really an instrument at all…).
It was quite a long survey.
And this will be a long article too.
If you don’t feel like reading, you can watch a video where I presented this work during some webinars.
It is at the bottom of the page (the video is in Italian).
All the images here come from that presentation.
Now I can start.
The (new) rules of the Tuscany Region
The Tuscany Region didn’t go easy…
Regional Executive Resolution 49/2020 approved the “Technical specifications for three-dimensional survey deliverables” for extraction activities.
In a nutshell, it says that every year, for ornamental stone quarries, a three-dimensional survey must be submitted, delivered as a point cloud.
I’ll go into the regulatory details in a moment, but I promise it is a big change compared with what had been required until then.
A look at the technical specifications
I don’t want to go too deep into the technical specifications I’ve just mentioned, but it is important to pull out the main points so you understand the sense of what I did and what I’m writing about.
Here are some passages, translated from the document (with a few omissions).
“The holder of the authorisation (concession) submits to the Municipality … a three-dimensional survey certified by the works director, delivered as a point cloud resampled at 0.1 metres in the open-source LAS format, georeferenced in the EPSG3003 or EPSG6707 reference system.
The network of control points must also be monumented in the survey.
For easier handling, the survey must be organised in homogeneous areas, delivering one file per area together with an index map, …, which still allows the complete processing of all the volumes moved.“

View of the Torano basin, in the Municipality of Carrara
Asking for a 3D point cloud implies that the data can only be captured with two technologies:
- LiDAR (terrestrial or drone-mounted);
- Photogrammetric reconstruction from images (taken from the ground or from a drone).
Full stop.
Traditional survey measurements are still very much needed (for ground control points, check points, control points, …) but they are not (only) what produces the required data.
And that’s not all, even though this alone was a real blow to the way quarry surveys had always been done.
There are other important passages in the technical specifications.
“To make handling easier and allow a more immediate reading of the three-dimensional survey, it must be accompanied by:
a plan drawing in PDF format and in georeferenced DXF/DWG vector format, …;
suitable cross-sections, ..;
one or more colour orthophotos, …, at the same scale and in the same coordinate system as the plan drawing, …, with a minimum ground pixel size (GSD) of 0.2 metres…
The technical representation of the plan drawing must be simplified into a georeferenced polygonal plane representation in SHP format…
The deliverables must ensure the following:
- horizontal tolerance 1δ ± 0.05mm;
- vertical tolerance 1δ ± 0.05mm;
- elevations referred to the national height system”
Not bad!
But I’ll come back to all of this further on…
Why a 3D survey?
I wondered why there was this (radical) change in the specifications for the annual surveys of extraction sites.
And I came up with some answers I’m happy to share.
They are entirely personal and could even be wrong…
If you want to add your own thoughts I’d be glad (write to me anywhere – email, Telegram, social networks – and I’ll happily extend the list below with your contribution).
- CONTROL
Annual quarry surveys are used (also) to check that everything follows the extraction plans, comparing the volumes extracted with those authorised by the approved projects.
If the surveyor shoots discrete points (with a GPS or a total station) and draws a plan from them, the situation it shows can only be simplified.
A point cloud, instead, “freezes” the state of the site at the time of capture and lets whoever is checking see the quarry very clearly and compare it with future (or past) years, getting an immediate grasp of the changes (with the open-source software CloudCompare it is very easy to measure differences between georeferenced point clouds and calculate cut or fill volumes; the videos are in Italian). - AVAILABLE TECHNOLOGY AND THE RIGHT TIME
Laser scanners have existed for many years, and photogrammetric techniques certainly didn’t arrive with drones.
But in both cases, a decade ago, these technologies were not really for everyone.
They needed expensive instruments and very specific skills.
Today (the technical specifications date from 2020) technology and, as a result, what the market offers have lowered the barriers to the instruments that capture or process point clouds, putting them within reach of more people.
Add the development of hardware and software that help handle large amounts of data quickly, and I think it is clear that this is the right time to move from traditional surveying to 3D.

2020 draws a line of change for surveys of extraction sites
The Carrara quarries and the survey area
There are more than 70 quarries in the Municipality of Carrara.
Or rather, those are just the concessions.
The quarries, meaning marble extraction sites, are many more.

View of the Carrara quarries from Monte Borla
The marble basin is quite a large share of all the ornamental stone extraction sites spread across the Tuscany Region.
It is a truly unique, fascinating, rugged place, anything but ordinary.
The Carrara quarries are close to home.
From my window I can see the summit of Monte Sagro, which towers over them.
And the Apuan Alps are mountains I’m very attached to and where I go whenever I can.
This article tells the story of the survey of one of these quarries: a concession that includes a good chunk of mountain, several active working sites, untouched rock, access roads and ravaneti (the local name for marble waste tips).
The aim of the survey was to record the state of the site at the end of 2020 and support the planning of new extraction projects.
Since Carrara is in Tuscany, the Tuscany Region issued the new technical specifications I’ve just described, and these require the delivery of 3D data, the survey was designed and carried out precisely to produce a three-dimensional point cloud.
And not only that…

An access road (comfortable and asphalted) in the Carrara quarries
lorano22
I had the pleasure, the honour, the burden and the task of working inside the largest concession (held by a single entity) in the whole Carrara marble basin.
I don’t mean the single largest quarry, but the whole territory under management.
The Municipality of Carrara gives each concession a unique name, made of a (place) name and a number.
I worked at Lorano22.

Aerial photos of 3 of the 7 working sites of the Lorano22 quarry
Inside it there are 7 extraction sites, access roads, waste tips (ravaneti) and material storage areas, meadows and slopes, water storage basins, buildings and underground tunnels, all within more than 100 hectares spanning a height difference of more than 600 metres.
It really is big!
This story is divided into 4 parts:
- Field surveys and operations;
- Data processing;
- Output and delivery;
- Final thoughts.
The field survey

The Trimble SX10 total station/laser scanner during the field surveys
Control points
Among the things required by the technical specifications are the control points:
“… the network of control points must also be monumented in the survey…
… at least 4 of them, necessarily monumented, placed in perimeter areas or on fixed references so as not to interfere with quarry activities and kept unchanged, where possible, throughout the life of the quarry…
… include the schedule of control points … with detailed description sheets for each point, giving at least the horizontal and vertical coordinates … in the EPSG3003 and EPSG6707 reference systems as well as suitable photographic documentation…”
The survey starts here, but even at this step there are a few things worth pausing on (I know, I’ve already paused several times!).
Necessarily monumented control points means putting something on the ground that is recognisable, has a known position and can be used for survey measurements.
Why control points?
But if we are talking about a 3D survey and the main output required is a point cloud, why do you need a network of control points on the ground?
Photogrammetric processing (in structure from motion software) does need points on the ground (Ground Control Points), but you can use artificial targets placed when needed and removed at the end of the survey.
They don’t have to be permanent.
And laser scanning, being an active technique, produces a point cloud whose coordinates are already right (relative to the scanner position) and only needs to be georeferenced as a whole on a few known points which, again, don’t have to be control points on the ground.

Control point monumented with a survey nail and measured with a (static) GNSS survey
The reason for such a specific requirement lies, again, in the idea of control.
But this too is my own interpretation.
If a public body (Region, Municipality, health authority, land registry, ….) wants to carry out independent checks, inspections and survey assessments, it can go to the quarry with a total station and use the position and coordinates of the control points (read from the description sheets) to set up, orient the instrument and start measuring, entirely on its own, in the same reference system used by whoever did the survey.
Similarly, a network of known points on the ground can be used by research institutions for their own analyses (university technicians and researchers often turn up in the Carrara marble quarries), or by other professionals for disputes, lawsuits and joint measurements.
I think the Tuscany Region also plans to build, through the surveys of individual private operators, a large map database of extraction areas.
That’s a good thing and, as a supporter of open and free data, I’ll add that it would be really nice if it could be (in whole or in part) accessible and available to everyone!
🙂
Georeferencing the data
The control point requirements contain another very powerful element of these technical specifications: the georeferencing of the data (stated and stressed in other passages too).
From now on you can’t do as you like.
No local systems, 0,0,0 or random reference systems among those available.
No tying to cadastral coordinates.
The Tuscany Region requires georeferenced data.
And it was lenient in leaving a free choice between two.
The point cloud and all the deliverables can be referred to the reference system with code EPSG3003 (Roma40 – Gauss Boaga – West zone) or to the one with EPSG6707 (ETRF2000 – RDN2008).
Even though the Roma40 reference system should be retired, giving way to the “new” ETRF2000, the option to use it was kept, so as not to cause another trauma…
🙂
The reason for the georeferencing requirement is also, in my view, quite simple.
If I receive survey data and have no idea which reference system the coordinates are in, it is very hard to use them for multi-temporal analysis and comparisons with other available data.
I would be holding data that need some work before they can be compared and, again, checked.
In principle I can only fully agree with the georeferencing requirement!
Monumenting the control points
Marble benches offer a nice surface for monumenting a control point.
But driving a nail into marble with a sledgehammer is practically impossible.
You need a hammer drill with a powerful battery to drill the rock, and possibly some quick-setting chemical anchor to improve the nail’s grip.


Control points and photogrammetry points
I already knew I would fly the drone for an aerial photo capture to process in structure from motion software.
So I knew I would need points on the ground to “fix” the model created from the images.
These are the GCPs (Ground Control Points).
Since I had monumented nails (far more than the four required!) on smooth white surfaces, I thought of making permanent targets around them with paint.
I cut a 70×70 foam PVC board into a triangular template.
I took a tin of blue paint, the kind used for road markings in pay car parks.
And I painted the marble with a “butterfly” (or a “cross”), blue on white, with the control point nail at its centre.


I monumented more than 15 control points, and this way I already had as many ground points ready to use in processing the drone photos.
I placed more than the minimum required (4) because in an area as large as Lorano 22 the distances between four control points can be long and intervisibility (whether and how they can see each other) can be poor.
If I have to go into the field with a total station I need at least two known points that can see each other (I set up the instrument on one and orient it on the other).
Checking this condition in large, complex areas is not trivial.
I can tell you that, more or less, I met the number of 4 control points set by the regional specifications for every single extraction site within the whole concession…
That way I knew there would be enough convenient points everywhere for independent measurements.

Part of the orthophoto showing the monumented control points
Surveying the control points
I’ve written a lot about control points but haven’t yet said how I surveyed their coordinates.
I did it in two ways:
- with a GNSS receiver;
- with a total station.
Where site conditions allowed, I used a GNSS antenna in static mode.
I didn’t need millimetre precision.
Such tight data weren’t required.
But I preferred a long acquisition (one hour per point) to get robust data.
This needed post-processing, but the resulting coordinates would be good.
Oh, an hour of static doesn’t give millimetre precision.
For that you have to log hours and hours of data!

Static GNSS survey of a control point’s coordinates
You may ask why I didn’t just take an RTK measurement…
And it is a very fair question.
I did, but not for the control points.
I did it for the extra points I surveyed as ground control for the aerial photogrammetry.
For the control points I wanted something a bit more solid.
So I chose static.
But I didn’t do it for all the monumented points…
There are places in these quarries that are really nasty for satellite measurements.
There is one working site, the “Sbasso” (the name, meaning “the lowering”, says a lot), which is a huge pit dug into the marble where you are surrounded by white rock walls 50 metres high.
In there, GPS struggles more than in more open places.
So I used the total station.
I oriented it on the control points already placed (in good spots) and started measuring.
I used this technique for other control points too, even easy ones, to speed up the whole network monumenting phase a bit.

Measuring difficult points with the total station (yes, I know, there’s no eyepiece and all the rest, but the one in the photo is a total station…)
More than 15 ground points at more than an hour each (plus driving along the access roads) would have meant a lot of time!
I preferred to complete the control network this way, which gave me excellent precision on the points and less time in the field.
Other total station measurements
I needed other survey measurements with the total station!
The photogrammetric processing (from the drone photos I’ll tell you about shortly) could have suffered from the large height difference and from not being able to place constraints (targets for Ground Control Points) everywhere.
In general, if you can spread the targets evenly across the height range of the site, the resulting model is less likely to be deformed or to suffer an annoying “flag effect”, caused by free, unconstrained parts that can move more or less freely (like a flag in the wind…).
But in a marble quarry in the Apuan Alps most areas can’t be reached on foot.
And it is unthinkable and impossible to place ground targets everywhere to measure with a GNSS antenna.
The total station helps.
If you can find points/features/things on the vertical faces that you can see well, measure (with the station’s laser) and know you’ll find again in the photos taken for photogrammetry (from a drone or from the ground), you know you can get important information.
Anything goes: the start of a vein in the marble, the head of a rock bolt or, as in this case, numbers and letters in red paint on the white marble, written by the rope-access workers (here they are called tecchiaioli) during their bolting and face stabilisation work.
Anything goes, as long as you can find it again, confidently, in the photos.

The red circle contains “CL1”, and these three characters hold good points to measure and use in the photogrammetric processing
Working in a traverse
For the total station measurements I worked in a traverse (open and oriented).
I oriented the first station by resection on known points (the control points) and then moved in legs of about 50 metres.
There are several reasons for choosing a traverse:
- You can measure points in complex areas (with lots of obstacles to sighting), keeping everything connected and with excellent precision;
- Given the size of the site, it is quicker to set up the tripod with the prism for forced centring, change station and take the backsight than to move with a “classic” prism on a pole over known points to do a resection;
- My total station also integrates a laser scanner and a photogrammetric system, and working in a traverse, launching scans from every station, gives me point clouds already registered with each other.

The forced centring prism used during a survey traverse
Laser scanning
Since my total station integrates a laser scanner;
Since the output required by the technical specifications is a three-dimensional point cloud;
Since laser measurement is active, free of the deformations or other problems that can arise in photogrammetric processing;
While I was at it…
…I took laser scans to capture three-dimensional data supporting the project and the data processing.
I scanned from the traverse stations, using the excellent features (for this kind of work) of my laser scanner (Trimble SX10).

In a place like this you need a scanner with a good range.
You don’t need a 6 km Riegl, but a machine that reaches 50 m isn’t a good idea either…
My scanner has a nominal range of 600 m.
But it actually covers a bit more…
In any case it was enough to reach all the areas of interest from all the scan positions.
It is a time-of-flight scanner, which brings little noise into the point cloud.
And since it is integrated into a total station with 1″ angular precision, the precision of the cloud points is also very good.
It is not a fast scanner, but it is very “powerful” in these cases.
Working in a traverse, I scanned at every station and the point clouds came out already registered with each other, saving me time in processing and giving me georeferenced measurements from the start.
Scanning in tunnels
There are 5 tunnels in the survey area, one of them active.

Laser scanning in the active tunnel
In the Carrara marble quarries they also dig indoors, inside the mountain.
And the tunnels have to be surveyed too.
The overall point cloud delivered must include the underground parts as well.
Outdoors, drone aerial photogrammetry makes a very significant contribution to building the 3D model; in tunnels laser scanning is far more effective.

Laser scanning in an artificially lit tunnel
In theory you could use photogrammetry indoors too, but this raises at least two problems:
- it takes a lot of time to photograph every part of the tunnel (walls, floor and ceiling), as well as placing targets for structure from motion processing and measuring their coordinates with the total station;
- inactive tunnels are not artificially lit, and any photos would have needed extra lighting, installed specifically for the capture.
The scanner proved much more practical (even though in narrow spaces my instrument suffers a bit from its slowness compared with other machines).
I set up a first scan station outside the entrances, oriented on known points and control points, and then went in, again working in a traverse, so I’d have georeferenced point clouds of the inside too.

Station outside the tunnel, oriented on known points
Where the tunnel wasn’t lit, the cloud points came out without colour.
But colouring the cloud was not a requirement of the regional specifications.
🙂

Laser scanning in an unlit tunnel. The cloud points have no colour.
Aerial photogrammetric surveys
In an open and (very) hard-to-reach setting like this quarry (and the marble quarries of the Apuan Alps – and not only those), drone aerial photogrammetry is the technique that delivers the most significant and complete data for the final output, the 3D point cloud.

DJI Phantom 4 Pro drone with an added external GNSS antenna for PPK processing
In flight, the drone photographs all the working areas, the untouched rock, the benches, the terraces and the parts hidden from the terrestrial scan positions.
It is really very efficient!
Unlike laser scanning, where the point cloud exists as soon as the scan ends, that’s not the case for photogrammetry.
At the end of the survey there is no cloud.
You have to create it by having software process images and survey measurements.
I won’t go into the details of this, of how such processing is done.
Put very briefly and crudely, you take photos and measurements, mix them together and out comes a point cloud, scaled, oriented and georeferenced.
And it all happens in software containing special algorithms called “structure from motion”.
But it really is a brutal description!
Here are some practical aspects I faced in the field at this stage.
Targets (on the ground) and GNSS measurements
Even though I had the control points I told you about above, I wanted more points to use in the photogrammetric processing.
Points with known coordinates, visible in the photos, tell the emerging 3D model what position it must take relative to a reference system and how it must adjust (correct its deformations) to respect the real distances measured in the field.
These are the GCPs (Ground Control Points), an essential, fundamental part of the whole process.
I’ll always stand up for them!
Even though some people talk about photogrammetric surveys without GCPs.
🙂
So I placed high-visibility targets.
In PVC where I could collect them quickly, and in paper in areas where I left them in place, disposable.
I surveyed them with the GNSS antenna in nRTK mode (no static for these targets), tied to the permanent station network of Leica SmartNet (formerly Italpos).

Paper (disposable) target as a GCP for photogrammetry
While I was at it, I took a few extra GNSS measurements.
Since RTK lets you take lots of points quickly, I took advantage of the quarry’s shape to measure bench edges and all the sharp breaks or obvious features (roads, buildings, …) recognisable in the 3D model, so they could be used to check the quality of the processed output.

GNSS antenna (Trimble R12i) surveying points on the benches
Aerial photos
And now for the photos!
This is the last part of the field work.
It meant taking aerial photos (from the drone) to be processed.
Here too, a few quick thoughts.
I flew manually.
I didn’t plan any automatic flight mission.
In a setting like this, with very steep vertical faces, I feel more comfortable and safer flying the drone myself.
I changed the height according to what I was flying over and photographing, to keep the shooting distance as constant as possible.
Nadir photos alone are not enough.
When height differences are small and there are no vertical elements to reconstruct, nadir photos might be enough for good structure from motion processing.
In a case like this, though, you need other images besides the nadir ones.
You must (or at least, should…) also take photos of the many vertical or near-vertical parts: the benches and the rock faces.
So I also took oblique photos, with angles varying between 60° and 0° (frontal photos) from the horizontal.
Together with the nadir ones they gave me good data to process into the photogrammetric point cloud.

An “oblique” aerial photo to reconstruct the vertical elements of this part of the quarry
Light, shadows, exposure and DNG/RAW
Plenty of things cast shadows on the survey area: columns, benches, excavated areas and mountains to the east.
And working all day long, the colour temperature of the light changed from photo to photo (in the morning and late afternoon the sun is “warmer” than at midday).
On top of that, white marble tends to fool the light meter of the drone’s camera, leading it to underexpose the whole scene or, with light and shadow, to overexpose the sunlit rock.
It was important to shoot all the photos in RAW/DNG format (digital negative/raw data) so I could “adjust” and correct them in post-production before structure from motion processing.
A JPG file wouldn’t have let me…

An aerial photo with strong alternation of light and shadow and colour differences
After more than 2,500 photos, millions of scan points, raw data, GNSS measurements and several days of field work, I could say data capture was finished.
Data that now had to be processed.
Data processing
Processing all the data wasn’t quick.
I won’t go into every phase in detail, but I’ll say a few words about each.
Let’s take it in order.
Georeferencing, elevations and GNSS data
I’ve already told you about the need to georeference the outputs in one of the two map reference systems, to choose between ETRF2000-RDN2008-UTM32N-EPSG6707 and Roma40-GaussBoaga-MonteMario-West zone-EPSG3003.
And about the need for elevations referred to the national height system…
Well, data processing starts here.
The measurements that drive the whole project are the ones taken with the satellite antenna, used to define the coordinates of the control points and of the targets used in the photogrammetric processing.

Trimble R12i GNSS receiver
I took these measurements and processed them with the tools needed to produce the required output.
I processed the raw data logged by the GNSS antenna in static mode, for the control points surveyed that way.
This gave me coordinates in the WGS84-EPSG4326 geographic reference system (latitude, longitude and ellipsoidal height).
Then I extracted the coordinates of the points surveyed with nRTK GNSS, tied to the permanent stations of the Leica SmartNet network, given in the ETRF2000-RDN2008-EPSG6706 geographic reference system.
From there I converted everything into the reference system chosen for the output, Roma40-GaussBoaga-EPSG3003 (since there were older, existing data and survey measurements for the survey areas in exactly this reference system), transforming the heights from ellipsoidal to orthometric.
To do this I used the “interpolation” software Verto3K and the GK2 grid covering the whole sheet 249 of the Italian 1:50,000 map series.
They are products of the IGM (Istituto Geografico Militare), Italy’s national mapping agency, and make transformations between reference systems and heights reliable.

The opening screen of the Verto3K software
If you are looking for an excellent and entirely comparable alternative to Verto3K, have a look at ConveRgo.
Total station measurements and laser scans
I processed the total station measurements and the laser scanning point clouds in the same place, Trimble’s surveying software: Trimble Business Center (TBC).
Actually I also processed the GNSS measurements in there, but then took them out to process them with Verto3K, as I wrote above.
There isn’t much to say about this phase.
In the workspace I see the scans, formally separate but effectively joined because they come from traverse acquisitions, and I see all the tacheometric measurements I took, both by sighting a prism and using the total station’s laser.
And from there I can do a few things, such as:
- edit the points of a resection;
- change the details of a measurement (prism constant, pole height);
- classify the cloud points;
- adjust a traverse;
- export the data;
- …

A screenshot of Trimble Business Center with the laser scanning point clouds and the total station measurements
Data always available and “forget-proof”
A very useful and effective feature of the instruments I used and of the software that manages the data is that you can always retrieve extra information sitting at your PC, without going back into the field to measure.
My total station/laser scanner also has a fairly advanced imaging system.
It takes photos to colour the scans, but also to have raster data paired with the 3D model.
And from these, using a series of options I won’t go into here, you can retrieve coordinates, draw features and query the model.
This way you go into the field with a “lighter heart”.
Not that you should take things lightly, but knowing there is a digital place where you can recover any data you may have missed in the field is very reassuring.
Especially if the survey is complicated and/or a long drive from your office.

Another view of TBC, where a 2D photo is linked to the point cloud and to the measurements taken during the survey.
Photogrammetric processing
And finally (at least, following the order in which I described the field work) came the processing of the images to create the photogrammetric point cloud.
Strictly speaking I should say structure from motion processing.
I won’t go into the details of what happens.
If you’ve already read other things here and in the other places where I share information online, you more or less know what it is about: photos + measurements (+ a bit of care and critical analysis of the data) = point cloud (oriented, scaled and georeferenced).
And so it was.
I processed about 5,000 photos, splitting the processing into four parts: two main extraction areas and two “satellite” zones, waste tips (the ravaneti, as they call them here in Carrara).
Could I have processed everything together?
Yes and no.
The two extraction areas are separated by a stretch of untouched rock that has never changed over time, and capturing it would have taken extra time.
I added the two ravaneti later.
At first we hadn’t thought of including them, but then we decided to survey them.
This survey is the “zero” moment, and it was important to capture data of everything that is changing within the concession, including roads and, indeed, waste tips.

Dense cloud and photo positions in the Structure from Motion software Agisoft Metashape
Merging the point clouds
Once processing was done, it was (only) a matter of merging the point clouds: the aerial photogrammetric one from the drone images and the one from the laser scans.
Here the coordinates helped a lot and made the work easier.
No registration between the 3D data was needed.
The clouds were georeferenced in the same reference system, and everything fell into place as soon as the data were imported into point cloud software.

Point cloud of the lower part of the survey area (the other, separate one is further up)
Joining the main areas with the Ministry of the Environment LiDAR data
The main survey areas were separate and, as I wrote above, there is untouched rock between them.
So as not to leave things disconnected, while avoiding surveying areas that haven’t changed over time and aren’t expected to change in the coming years (given the extraction plans), I downloaded from the Tuscany Region geoportal (Geoscopio) the 1x1 m DTM created from the Italian Ministry of the Environment’s LiDAR data (2008 surveys).
Where things have changed it isn’t meaningful data, but where everything is still it’s not bad at all!
From there I generated a point cloud in QGIS (video in Italian).
I adjusted heights and reference systems and merged it (cropping the part I needed) with the two quarry survey point clouds.

Point cloud created in QGIS from the 1x1 DTM made with the Ministry of the Environment LiDAR data
The points aren’t coloured, they are quite far apart (about 1 m) and the join is fairly obvious, but in terms of morphology and terrain everything adds up and the two portions are now connected.

Merging the point clouds of the main working areas through the Ministry of the Environment LiDAR data
P.S.
This was an extra that wasn’t required, but I think it is useful for the final output.
Subsampling the data
A specific requirement of the Tuscany Region’s technical specifications for the output point cloud concerns subsampling the delivered data:
“…three-dimensional survey delivered as a point cloud resampled at 0.1 (zero point one) metres…”
This means the cloud points must be on average about 10 cm apart.
10 cm is not a little.
It means discretising heavily data that are natively denser.
But I understand the requirement, driven by the need for manageable files, with a reasonable number of points and a limited size, so they can be opened and handled on “normal” hardware too.
A 10 cm subsampling still gives an understandable description of the surveyed site, good enough for future analyses, calculations, estimates and comparisons.
I approve of the choice!
🙂

Point cloud of a tunnel connected to the outdoor data.
In practice subsampling takes very little time and two “clicks” in any point cloud software.
I used LiDAR360 (software I also used for other processing I’ll tell you about shortly), but CloudCompare works very well too (an excellent open-source solution). Both videos are in Italian.
Going from hundreds to a few tens of millions of points is quite a slimming down!
😉
Output
The processing of the field data is finished.
From here two roads lead to the output.
One is very short and concerns the 3D output: the point cloud.
The other is still long and has to do with producing the required 2D outputs: plan, cross-sections and shapefiles.
Actually, between these two roads there is another short “path” that gives you a 2D output quickly: the orthophoto.
3D output – point cloud
Here things are very simple.
The point cloud required by the technical specifications exists because it is the result of processing the field data, and it is ready for delivery.
There isn’t much else to say.
It’s a matter of saving the data in LAS format and setting it aside for delivery.
If there is more than one survey area and they are separate/distant from each other, you can deliver two or more separate LAS files, one per “homogeneous” area.
“Quick” 2D output – orthophoto
Back to the Tuscany Region’s technical specifications, which require:
“….One or more colour orthophotos in JPG or ECW format, made at the same scale and in the same coordinate system as the plan drawing and showing, besides the area of the latter, the position of the network of control points used.
The orthophotos must have a minimum ground pixel size (GSD) of 0.2 (zero point two) metres and must be adjacent and not overlapping.
For underground quarries, only the open areas affected by works, storage, stockpiles and other related areas are to be considered…”
I wrote that getting the orthophoto is a quick path.
I wrote it because I did the aerial photogrammetric survey of the whole area, taking drone photos and processing (also) a photogrammetric point cloud.
That is where you generate the orthophoto from.
The photogrammetric processing software (structure from motion) orthorectifies the images, removing lens distortion, joins them and drapes them on a surface used as a reference (DEM or mesh).
The result is an image of the whole surveyed area, with the detail of the photos in the dataset, oriented and georeferenced.

Part of the orthophoto generated from the drone images processed in the photogrammetry software
A couple of thoughts on the orthophoto.
Orthophoto resolution
A resolution of 20 cm/pixel is rather “poor”, especially given the shooting distance of the images in the photo dataset.
And this applies to most drone captures (even considering the regulatory limits).
Here too I think the requirement aims at more manageable data.
Resampling an image (orthophoto) is very simple (and quick).
You can do it while generating it, inside the structure from motion software.
You can use QGIS (without losing information) or photo editing software (bearing in mind that you’ll lose the georeferencing information).
Orthophotos from aerial photogrammetry
I understand that an orthophoto helps a lot in reading the survey area (like a photographic map).
But a requirement like this is not “light”, because it almost forces you to use drone aerial photogrammetry.
While the 3D point cloud can be created with either laser scanning or photogrammetry, the orthophoto, given the complexity of a quarry (with benches at various heights, yards, escarpments, untouched rock, …), is in practice only feasible with aerial images taken by drone.
Even if you managed to get a complete point cloud from laser scanning, you could try to create an orthophoto, but the result doesn’t compare with a true orthomosaic where the images are orthorectified and then joined together.
In short, you need aerial images.
I’ve talked about drones (and that’s what I used), but given the resolution required, a photogrammetric flight by aircraft could also do, or even satellite images, which reach this level of detail (covering large swathes of territory, far larger than the area of the biggest quarry concession!).
“Demanding” 2D output – the plan
Now, this part took me a lot of work.
Not as much as the field work, but by no means negligible.
I mean producing the general plan of the surveyed area for which the point cloud was produced.
Here is the requirement in the technical specifications:
“To make handling easier and allow a more immediate reading of the three-dimensional survey, it must be accompanied by:
- a plan drawing, delivered in PDF/A format and in DXF or DWG vector format georeferenced in the EPSG3003 (…) or EPSG6707 (…) reference system, which must show the location of the network of control points used and must have a scale of 1:500 or 1:1,000;
- suitable cross-sections comparable with those in the approved project, also showing the overlay with the latter;
- suitable cross-sections comparable with those in the approved project, showing an overlay with the state of the excavations at the end of the previous year, if available.
…“
If the requirement to produce three-dimensional data as a survey of the state of the site at the end of the calendar year was a change, an important one, but entirely looking towards new survey techniques and new spatial data, the requirement for a plan and sections is a bit like the anchor and chain that keep the process tied to what had been done until now.
And to what administrators have always been used to reading and assessing.

Personally I think that going from rich 3D data to a 2D plan means much more than just losing one dimension (the “z”).
It’s a bit like riding a dirt track on a road bike with tubulars at 10 bar.
Personal opinions aside, reaching this goal took a lot of work.
- A plan needs contour lines.
- And contour lines must represent only the ground,
- But the contour lines of vertical features collapse on top of each other.
It may not seem obvious, but I assure you the impact (in terms of work needed) was large.
And as a result it also affects the overall cost of the job.
I think that, to make these surveys easier from an economic point of view too, a requirement like this should be set aside.
But, again, that’s just my opinion…
Generating contour lines means cleaning (or, more elegantly, classifying) the point cloud to obtain, as well as possible, the points of the bare ground (or of the marble).
I used semi-automatic algorithms (in LiDAR360, video in Italian), but I still stepped in by hand to fix any errors or gaps left by the software.
Creating contour lines from an unclassified cloud means getting vectors that also represent the blocks stored in the yards, vehicles, excavators, huts and buildings; all things that have nothing to do with the ground.

Blocks in a yard that required fine classification of the point cloud before generating the contour lines
Generating the contour lines went through a triangle model (TIN) of the whole area, choosing a one-metre contour interval, in line with the requirement to produce a plan at 1:1,000 scale.
And from there I got to the famous vectors.

TIN surface (made of triangular elements) of the surveyed area

Contour lines generated in LiDAR360
Now it was a matter of editing the contour lines in the vertical parts, where they collapse on each other.
And there are many such zones in the survey I did: all the benches and the more “upright” parts of the exposed rock faces.
I worked in CAD, with the help of the orthophoto and the 3D model, and with a lot of patience in a long process of cut and stitch….
If I haven’t already told you it was long, I’ll tell you again here: it was long (and also rather boring…)
It was important to rely both on 2D outputs (high-resolution orthophoto), which give a reference base in the two-dimensional space of the CAD drawing, and on the point clouds, which give a privileged view of the model to be vectorised.
In many cases I drew directly on the point cloud, exporting the vectors in DWG format.
It didn’t take me a short time…
Oh, but I think I’ve already told you that!
🙂

Vectorising the point cloud in Trimble Business Center
And then I also drew:
- the roads;
- the buildings and huts;
- the stockpile and storage areas;
- the “ravaneti”;
- the tunnels;
- the water storage areas;
- the control points
Here is the result (for part of the surveyed area)!

General plan at 1:1,000 scale of part of the quarry
It’s not over yet: GIS and shapefiles
One more thing is missing from the 2D output: the shapefiles to go into the regional databases and be loaded into GIS software.
Here too is the specific requirement:
“… the technical representation of the plan must be simplified into a polygonal plane representation in shapefile format georeferenced in the EPSG3003 or EPSG6707 system, containing these information fields:
- regional ID of the deposit;
- regional name of the deposit;
- regional ID of the district;
- regional name of the district;
- reference year;
- survey date;
- main land use of the area;
- level of the reference plane;
- average elevation…“
Preparing these files isn’t that complex in itself.
Quite the opposite.
A good thing about the vector representation in CAD is that you can take the vector files straight from there and create the shapefiles.
Each vector (open-cast excavation area, working yard, tunnel, technical services area, …) has an associated database (DBF) where the required information is entered.
All in all, it was quick.
This way the regional offices get discrete information on area features that weigh very little and need only GIS software and a perfectly ordinary PC to be read.
And georeferencing places everything correctly within the regional territory.

Polygons in shapefile format created from the vector data of the survey area
Control points and description sheets
The last requirement concerns the description sheets of the monumented control points.
A description sheet is a card with useful information for whoever can/must/will use that nail/feature on the ground in their surveys.
This information is the coordinates that identify its position and everything that helps you find it in the field.
I assure you that if you didn’t place the point yourself, it is practically impossible to find without a well-made guide.
The technical specifications require that:
“The deliverables contain the schedule of control points monumented on the ground with detailed description sheets for each point, giving at least the horizontal and vertical coordinates in the EPSG3003 and EPSG6707 reference systems as well as suitable photographic documentation”.
All the data were there.
It was a matter of putting them together neatly in a clean copy.

Description sheets of the monumented control points
Final thoughts
That’s all for the operational part!
I’d like to end this (long) article with a few final thoughts.
Technical report
Even though the regional technical specifications don’t require it, I added a Technical Report describing the work and presenting the results.
Perhaps it was implied (although I think there should be nothing implied in these cases), but I think it is important to summarise the whole job, think it through, understand the process, check the results and, above all, have a place to put stamp, signature and, above all, responsibility for the work done.
There is no perfect instrument
I used quite a few instruments on this job.
Some of them rather “advanced”.
But none is better than the others.
Nor is there one that lets you bring home all the data you need on its own.

Trimble SX10 total station/laser scanner on a quarry bench
I’m a fan of integration, and only by combining instruments can you get the best results in terms of output and efficiency.
Watch out for safety
A marble quarry in Carrara is a potentially dangerous place.
Even with a Safety and Coordination Plan, people in charge, protective measures and personal protective equipment, it is still a place where you need to look around carefully, and not just fiddle head-down with your instruments, tablets and controllers!

Areas exposed to falls from height (great height)
In these cases the support you get on site from people who know the quarry and how it works becomes important.
That’s why I can never thank Mirco Ferrari enough, the cooperative’s works director, for all his help, for the countless lifts in his off-roader up and down the access roads, for the water and for the focaccia with mondiola (mortadella) at the many Apuan lunches!
Measure everything you find in the field
In surveying there is a rule you won’t find in textbooks, but it is rather important.
It can be put in various ways.
The most immediate is “the more the better”, which more elegantly means “one measurement too many is much better than one too few”.
The experts would say “aim for data redundancy”.
In practice it works like this: “if you find something in the field whose measurement could be useful during processing or when checking the output, survey/measure/shoot/note it, …”

Targets found in the field (refreshed with a coat of new paint) and surveyed with a GNSS antenna
In this case I found on the benches some old marks from surveys by the CGT (Centre for GeoTechnologies) of the University of Siena.
They were a bit faded.
I refreshed them with red spray paint and measured them with the GNSS antenna.
They were good extra points, clearly visible in the aerial photos, which I used in the structure from motion processing.
Light, controllers and LCD screens
Choosing a controller to run your survey instruments might seem, on the one hand, not very important and, on the other, obvious.
We tend to use the best and newest technology, but it isn’t necessarily the best choice.
The environment you use it in has a big impact on the choice of display.
In a white marble quarry, in summer (because that’s when I did most of the surveys of the area), there is strong light everywhere.
The display has to be pushed to maximum brightness for you to see anything.
And the batteries drain fast.
If you have no charging points and/or spare batteries, the risk of running dry is real.
And that would mean stopping the survey.

Controllers in the field – I started with the one on the left and then switched to the one on the right
During the job I was able to switch to another fairly advanced controller (from a Trimble T10 to a Trimble TSC7), but with a smaller screen and a very efficient battery setup (two separate batteries, hot-swappable in the field).
It was much better!
🙂
Radios
Your phone won’t necessarily have good reception everywhere.
It doesn’t.
And you often need to communicate between distant points of the quarry.
Or points that aren’t far apart as the crow flies but are far in terms of the time it takes to get from one to the other, because there may be a working site or a canyon and you have to go all the way round.
So a radio is a precious resource, with a very high benefit-to-cost ratio.
It costs little but helps a lot!
Heat, water and working hours
Working in quarries is tiring.
OK, I didn’t split stones or topple benches, but I was still tired, because it’s the environment that wears you out.
In summer it’s hot, you are constantly exposed to the sun (the Tyrrhenian side faces south-southwest) and the light bounces everywhere, very strong.
Your eyes tire quickly.
And if there is a sea breeze, you may feel less thirsty and could even get dehydrated.
Sunglasses, sun cream and lots of water are essential.

…
You also need to assess carefully how much time you can realistically spend in the field.
If the area is large and the survey complex, it may take several field days (it took me about 15).
Pushing 10-hour days for several days in a row is unthinkable here.
At 1 pm everyone leaves!
The risk of ending up boiled is high.
Better to plan a few extra days and take it easier.
Your clarity when measuring will thank you!
🙂
Thanks
Now I’d say that’s really everything!
It was a wonderful adventure in which I learnt a lot and came away with a bit more experience.
I hope to do more like it!
Before really finishing, I’d like to thank, besides Mirco Ferrari, whom I’ve already mentioned:
Maurizio Profeti, for the constant technical exchange during the survey, the help in producing the deliverables and his point of view as a rock-climbing geologist, which helped me understand many details and technical aspects I would never have grasped on my own;
Valentino Carnicelli, for his help in the early stages and in planning the whole job;
Maro Pellegrino, for the operational support in the field, for meeting all the practical requests during the various difficulties of the survey and for inviting me to present this case study in the “Trimble Digital Program” training programme;
Luca Gusella, for the invaluable help in processing the field data and for the tricks and advice during capture to optimise the whole process;
Matteo Lapini, for his great availability and that of the whole Spektra/Trimble Italia team, which is by no means a given!
I hope you enjoyed this story.
Thanks for reading all the way here.
If you have doubts, questions, curiosities, comments or anything else that comes to mind, you can write to me or send me a voice message on Telegram, where I’m @paolocorradeghini.
Video and presentation