If someone told you a drone survey would be precise to the millimetre, maybe they told you a half-truth. In this article I’ll try to give you some tools to assess the reliability of an aerial photogrammetric survey in terms of its accuracy.
Let’s say straight away that instead of precision we should talk about the accuracy of a survey.
I know it’s a bit of hair-splitting, but as an engineer born under the sign of Virgo I care about saying accuracy as much as I care about the right technical word for anything else!
Precision comes from error theory, which takes up a large part of a university surveying course. A measurement is more precise the more repeatable it is, with minimal error from one measurement to the next.
Accuracy, instead, refers to the quality of a measurement, i.e. how close it is to the true value, without, for example, systematic errors.
What you care about is accuracy.
With that clarified, which perhaps adds no value for your purposes, let’s talk about the precision of a drone survey. Oh no, the accuracy!

The GSD
A very important parameter of an aerial photogrammetric survey is the spatial resolution, defined by the GSD (Ground Sampling Distance).
The GSD is the distance, measured on the ground, between two neighbouring pixels of the image.
In practice, the GSD is the size of the pixel on the ground.
If you zoom right into a digital image, at some point you’ll start to see it as squares. Lots of coloured squares. Those are the pixels. The GSD tells you how long the side of the pixel is on the ground. The smaller the GSD, the more detailed the photo.
The GSD depends on the resolution of the drone’s camera, the focal length of its lens and the flight height.
For example, to get pixels corresponding to 1 cm on the ground with a “ready to fly” drone like the DJI Mavic Pro, you have to take photos 25 m above the ground. With another camera (on another drone) you might get the same definition flying at 50, 70 or even 100 m.
![]()
However, if the flight missions for an aerial photogrammetric survey are planned for a 1 cm GSD, it doesn’t mean the accuracy of the delivered survey is 1 cm!
Relative and absolute accuracy
Drones have an onboard GPS that helps the software stitch the images together when reconstructing the 3D model of the surveyed area. But these GPS units aren’t precise enough to place the model exactly where it should be with, say, centimetre accuracy.
Yes, I know, there are drones with a high-precision RTK GPS system on board, which partly blows away what I’ve just written, but since they’re still much less common than a DJI Phantom or DJI Inspire, I’ll leave them aside.
You could measure the distance between two points on a reconstructed 3D model and check that it’s fairly close to the one measured in the field. But you might then find that both points are 1 metre from where they should actually be on the Earth’s surface!
The accuracy of an aerial photogrammetric survey can be relative or absolute.
Relative accuracy measures how the points are positioned relative to each other in a reconstructed model (an orthophoto or a DSM).
Absolute accuracy refers to the differences between the position of the points in the reconstructed model and their actual position on Earth.
In many cases you might not care whether the surveyed points are exactly where they should be.
You still measure volumes, distances, height differences…
But to do things properly, for monitoring, for large surveys, for using the data in GIS and within reference systems, you need absolute accuracy.
GCPs – Ground Control Points
To move towards absolute accuracy you need to rely on Ground Control Points (GCPs).
I wrote something about them in this article on how an aerial photogrammetric drone survey works.
GCPs are clearly visible points on the ground whose coordinates are known with high accuracy, because they’re measured with professional instruments such as an RTK GPS receiver or a total station.
The absolute accuracy of the whole aerial photogrammetric survey can’t be better than that of the Ground Control Points!
And it’s important that the GCPs are measured with an accuracy better than the size of the pixel on the ground, the GSD.

You should also know that absolute accuracy depends on the relative accuracy of the model.
They may tell you they’ll survey lots of ground control points with millimetre precision, but if the 3D model isn’t done well, the house of cards wobbles…
The quality of a 3D model depends on many factors linked to the drone’s flight (weather, lighting, GPS coverage, cruising speed, stability), which I won’t go into now so as not to put too much on the plate.
But you’ll understand that if 50% of the photos taken in flight are blurred, you can’t hope for a good 3D model.
And so no accuracy…

What accuracy to expect from a drone survey
According to the literature and partly to my field experience, you can expect an error of one to three times the pixel size for the relative accuracy of a correctly reconstructed 3D model.
With a GSD of 2 cm you can have a relative accuracy of 2-6 cm.
For absolute accuracy the values range from one to two times the GSD horizontally and from one to three times the GSD vertically.
These accuracy values aren’t global and constant over the whole surveyed area, though; they depend on the characteristics of the terrain.
They could be larger, for example, on irregular ground with significant height differences…
Good practice is to check the accuracy of a survey by measuring the coordinates of more points on the ground besides the GCPs used for 3D modelling. With these extra points you can assess and estimate measurement errors.
In conclusion
If you want to check whether the stated precision of a drone survey you’ve commissioned is believable, you can do this.
Ask the surveyor what the GSD of the survey campaign is.
If they say they’ll have to calculate it once the job is done, don’t believe them!
The GSD is set when planning the flight missions and depends on the flight height, so if they know the camera they must be able to calculate it.
Once you know the GSD, you can assume a very conservative average accuracy of 3-4 GSD.
Make sure the surveyor measures a sufficient number of control points on the ground, evenly spread over the area, enough to build a robust 3D model (10 to 15 GCPs) and to check the overall accuracy (about 8-10 points).
Make sure the field measurements are taken with professional survey instruments and not with a carpenter’s rule, a measuring tape or a cheap laser distance meter.
I hope I’ve given you useful information to assess the precision of a drone survey.
Oops! The accuracy!
Now you should be able to unmask anyone selling aerial photogrammetric surveys with sub-millimetre precision!!!
See you soon!
Paolo