An aerial photogrammetric survey for a wind farm
The story of a drone photogrammetric survey of a 2.5 km ridge in Tuscany for the design of a wind farm: planning, fieldwork, mistakes, processing and delivery.

In this article I’ll tell you about an aerial photogrammetric survey for designing and then building a wind farm for clean energy production, in the Tuscan hills, in the land of Giotto.
It will be a story that’s partly technical and partly not.
It may be long.
I don’t know yet.
I’m writing it in pieces (right now I’m in the café of a bookshop in Rome) and I may lose the thread more than once.
In fact I certainly will, but I hope to keep some consistency in the writing.
I’ve been away from this blog for a while.
Time went by and things to do piled up.
I don’t know whether to apologise or thank you for your patience.
Either way, it wouldn’t change things.
What I’m doing is committing to writing regularly again.
Perhaps with shorter articles.
But more frequent ones.
OK.
Preambles, introductions and apologies over.
Now let’s start the story!
!PRAZER!
The reason I’m writing this article is to tell you what lay behind this survey:
- planning;
- action;
- processing;
- delivery;
- mistakes;
- lessons;
- …
In Italian: PRogrammazione, AZione, Elaborazione, Restituzione.
!PRAZER!
This acronym came to me on the spot, but I’m noting it down and I’ll reuse it a lot!
🙂
My client
My client was ITALSABI.
It’s a company from Vicenza that has been working for decades in industrial inspections and non-destructive testing.
It has a drone team it uses to reach places its people can’t get to on foot.
Or where it’s dangerous and/or expensive.
A second company (which I can’t name, for confidentiality reasons and at its specific request) commissioned ITALSABI to carry out the aerial photogrammetric survey of a mountain ridge, where it was planning to install new wind turbines.
The survey would be used for the design, for obtaining permits, for construction, for planning the site works (above all transporting materials up the mountain) and for safety.
Italsabi called me in to handle the whole survey, putting its equipment at my disposal (above all its flagship drone, the DJI Matrice 210).
For me, Italsabi is Gianluca Dal Bianco, its sales manager.
Gianluca is great!
He brought drones into Italsabi and opened a new business line for the company.
He chose to come into the field with me to experience a photogrammetric survey first-hand and understand what’s behind it, so as to be more aware of it (important when dealing with his next clients and preparing quotes).
On top of that, he’s a legend of the rock scene in the Veneto!
A long-time multi-instrumentalist, with whom I found plenty in common reliving the 1990s punk rock scene!
He’s an artist who paints with a palette knife on canvas, using very strong, vivid colours.
And he’s a really good person!

He trusted me fully with the work and helped me a great deal in the field.
Where
For the same reasons I couldn’t name the lead company in this technical team, I can’t tell you exactly where we worked either.
But don’t worry, it isn’t essential to this story.
It isn’t a city or an easily recognisable place.
Or anywhere very special.
So you don’t miss much without this specific information.
I can tell you, though, that it’s the Tuscan hills on the border with Emilia-Romagna, in the province of Florence, in Giotto’s homeland.
Come on, I’d say that’s enough to place the site.
I’ll also add two panoramic photos taken during the survey.

The area to survey covered 30 hectares, stretching for 2.5 km along a ridge, over a 400 m height difference.

Why an aerial photogrammetric survey?
Italsabi had won a tender for aerial photogrammetric survey services with an RPAS (Remotely Piloted Aircraft System, which is what it should always be called, not drone, as I bluntly say!).
That’s the reason for the technical choice of using a drone.
The photos above show a fairly wooded setting, with a long clear strip along the crest.
Photogrammetry may not be the best technical choice for this kind of thing.
Still, in a case like this, using a drone to take photos and process them in photogrammetry software makes sense.
Also, and above all, in terms of survey time and the related costs.
Here’s why, with some of my thoughts:
- a survey with a LiDAR sensor on a drone would have cost more, and the logistics and transport wouldn’t have been easy at all (we too had to backtrack on a technical choice, but I’ll explain that later);
- the area to cover wasn’t large enough to justify an aircraft or helicopter carrying LiDAR sensors and photogrammetric cameras (solutions that start to pay off for areas over 300 hectares);
- a ground survey with a GNSS antenna would have taken much longer to measure all the points needed to describe the topography, morphology and relief of the area (and would have cost more);
- with a total station, on top of the GNSS considerations, we’d have had to carry heavy, bulky equipment for long stretches on foot, and we’d have needed two people in the field;
- a terrestrial scanner, even a “multi-echo” one, would have needed many scan stations to cover the whole area continuously and robustly, would have been heavy to carry, and the technology is more expensive anyway;
- the trees on the sides of the ridge were bare, and they were beeches, which by their nature don’t let any undergrowth grow, so there was a good chance of seeing plenty of ground points in the drone images (as long as we worked in winter!);
- if this area had been covered by the Ministry of the Environment’s LiDAR data (1 m grid), we wouldn’t have done this survey, because that data would have been enough to design the wind farm.
Expected results
These were the outputs to produce and the specific requirements for delivery:
- 3D points (characteristic of the ground) with a ground density of one point per square metre (in txt, las, shp, dxf format);
- a digital terrain model (DTM) with a 1 m grid (tif and ASCII grid);
- contour lines at 1 m intervals (shp and dxf);
- an orthophoto (GeoTIFF);
- a general plan in CAD (dwg format).
All the data had to be georeferenced in the Roma40 – Gauss-Boaga map system (it should be retired, but it’s still in huge demand in Italy!) and the overall accuracy couldn’t exceed 30 cm on the 3D position of the points.
As you can see, it wasn’t a survey with an “extreme” delivery.
In fact, you don’t need super data to design a wind farm (and I’m not talking about setting out the foundations!).
Lately I see more and more of a tendency to ask for billions of points with extreme precision to support general pre-feasibility studies.
It isn’t necessary!
I think it’s important to stay focused on the real needs, avoiding spending extra money and then having to handle large amounts of data, which are certainly not light.
Planning
Flight missions
I chose to take nadir photos, flying the drone on programmed automatic missions.
The ground wasn’t that steep, and the delivery wasn’t demanding enough to require a dataset of tilted photos as well.
Nadir flights would be enough.
I chose a theoretical GSD (Ground Sampling Distance) of 2.5 cm/pixel.
The plan was to use Italsabi’s drone, a DJI Matrice 210, fitted with a DJI Zenmuse X5S camera.
I prepared flight missions for it using the Thopos + Litchi combination and also the UgCS software.
But as a backup I also prepared missions covering the same area at the same GSD for my DJI Phantom 4 Pro, which I decided to bring into the field as a spare.
And just as well!!!
I designed an overlap between consecutive photos (overlap) and adjacent strips (sidelap) of 80%.
By now that’s my default value.
At first I worked with 70% overlap and 60% sidelap.
But sometimes I couldn’t align all the photos well.
With 80% I’m much more conservative about data quality.
I come back with more photos, but that’s fine!
The flight heights were about 120 m for the Matrice 210 and 100 m for the Phantom 4 Pro.
Strictly speaking I should talk about the drone’s height above the ground (AGL, Above Ground Level).
I chose a cruising speed of 4 m/s.
I’m not a big fan of the rule that says you can increase the drone’s cruising speed by 1 m/s for every 10 m of extra height.
There are a few critical issues to consider.
In short, if you overdo the speed and the day isn’t sunny, you might get slow shutter speeds and blurred photos (very dangerous for photogrammetric processing!).
What’s more, I shoot RAW, and the minimum interval between two photos in this format (with the equipment I use) is 5 seconds.
I try to make it 6, to be safe with the memory card buffer, and that means lower speeds to keep high overlap between consecutive photos.

Ground control points and check points
The survey area was a long, narrow snake.
The average width of the strip to survey varied between 100 and 150 m.
In a situation like this it’s important to plan the positions of the ground control points and check points for the photogrammetric processing carefully too.
If you don’t constrain the model properly along the whole length of the area, there’s a real risk of significant deformation at one end of the survey area.
Or even at both!
I designed the point layout in Google Earth.
It works well!
Especially over large areas.
Once you draw the boundary of the area, you can see whether the points are placed “well” (i.e. evenly distributed over the surface and in height).
You don’t need fine detail.
Just an idea of the distribution.
And Google gives you that.
I planned to survey 30 points: 18–20 ground control points (GCPs) and 10–12 check points.
In a “wild” area the only choice is to lay high-visibility targets on the ground, since you can’t count on manholes or road markings and can’t use spray paint.
Targets have the advantage of being clearly visible in drone photos.
But they have the drawback that they have to be collected at the end of the survey.
Unless you choose to use disposable targets and leave them in the field.
I use PVC targets (100×100 cm), and leaving them there isn’t on!
Because of the cost but, above all, because of nature.
So I had targets printed on plotter paper, with the idea of leaving them in the field at the end of the survey.
The survey took two days.
On the first day we laid the targets and surveyed their positions.
On the second we flew and took the photos.
The targets had to stay put for a whole night without moving.
There are many variables to consider in these cases: rain and wind, humidity and dew, animals, …
So they have to be fixed well.
But that isn’t enough.
There’s always a chance that some will “go missing”, so it’s wise to be sure you have enough points for the software processing.
We erred on the generous side, laying 40 targets.
We weighed them down with stones and logs.

But we also laid several PVC ones (more durable), pegging them down with tent pegs.
We were more confident these would stay put for several days.
The peg holds well.
We placed them in strategic positions for orienting the photogrammetric model and at points we’d certainly pass through to launch the drone during the flights.
Once operations were over, we’d collect them on the way back.
The others would dissolve with the next two or three mountain downpours.
It isn’t pretty, but I don’t feel like a polluter.
Recycled plotter paper and monochrome printing with little ink.
But I wanted to tell you everything.
I’m ready for any criticism, but I’m also open to any suggestion for good disposable targets.
Collecting all the targets at the end would have taken several extra hours and kilometres.
We surveyed the target coordinates with a GNSS antenna in NRTK mode.
The mobile data connection was fine, and so was the sky view, so it was a choice of convenience, combined with efficiency and speed.
The ideal would have been a base+rover system with a radio link.
It would have been faster and a little more accurate.
However, there weren’t many points to measure, and leaving a fixed base in a vast area would have meant leaving it unattended (I doubt wolves and roe deer would have been interested) and, above all, would have meant collecting it and, most likely, changing its battery halfway through the day.
That would have been rather inconvenient for the minimal benefits it would have brought.

The required accuracy wasn’t demanding, and the precision of the NRTK GNSS measurements on the GCPs and check points (5–10 cm) was more than enough for the purposes of the job.
A misjudgement
There were some mistakes and stumbles in this survey.
I rarely manage without any.
What matters is knowing how to deal with them and get around them to reach the result.
The main mistake in this story was not doing a preliminary site visit.
That was a misjudgement.
It should always be done.
The site visit, I mean, not the misjudgement.
🙂
Even in simple, “safe” cases.
But here Google’s model was so good that we could check all the access roads and estimate travel times.
We were fairly sure we’d make it by car.
I was fairly sure.
And then we were told a Fiat Panda 4×4 would get anywhere.
They practically guaranteed it.
People who know the area.
We trusted them, rented one, loaded it and set off.
But we hadn’t reckoned with how unpaved the unpaved road was!
Its line was perfect in Google Earth.
But you can’t see the details.
And its surface very soon turned out to be impassable.
Even for a Panda 4×4.
And, I’d add, maybe even for a Land Rover Defender!

We got out, checked on the map how much road was left, weighed up the equipment to carry, counted our arms and backs (4 + 2) and had to give up the Matrice (in a very large hard case, plus another for batteries, camera and lenses) for the Phantom 4 Pro, packed into a backpack with ten batteries, controller and accessories.
The good news was that the flight missions for the Phantom 4 Pro were ready.
The bad news was that we’d spend more time flying and come back with more photos of slightly lower quality.
And we’d have to race against time, because the planned car transfers would have taken much less time than our legs.
Though our health would benefit!
It was a forced choice.
There really was no other way.
And in the end everything went well.
But I take full responsibility for it.
I’ve noted an important lesson for the future.

The flights
There isn’t much to say about the flights beyond what I’ve already written.
We flew the Phantom 4 Pro on automatic missions in VLOS, pushing it to the limits then allowed by the Italian ENAC rules (as of March 2019): 500 m from the ground station and 150 m above the ground. Today’s European rules are different.
In these cases it’s very important to have an observer keeping the drone in sight at all times during the flights.
And Gianluca was impeccable!
I relied on the missions programmed in UgCS and used its app, installed on an Android tablet, to launch and run them in the field.
Everything worked well.
Constant GSD (terrain following)
The height differences weren’t extreme, but it was still important to keep a constant distance between drone and ground, to a reasonable approximation.
That way the theoretical GSD stays constant, to a reasonable approximation.
UgCS takes Google’s elevation model and uses it to plan the missions, varying the drone’s flight height.
I get on very well with it.
It costs a bit, but it works.
If you like, you can also load an elevation model you created from a previous photogrammetric flight.
Even a rough one.
Watch out for the wind!
An important aspect of the flights, valid in general but above all in this case, is the wind.
If a wind farm is planned, the area is obviously windy.
And it’s reasonable to expect wind during the survey.
And so it was.
It wasn’t a howling gale.
It didn’t stop us flying.
But there was wind.
And when there’s wind, batteries last less.
When planning the flight missions I was cautious about times.
While I normally feel confident doing a 15-minute mission (actual flight time), plus take-off and landing, in this case I planned flights of no more than 12 minutes.
I left myself some margin on each battery.
And it helped me do everything with reasonable calm and none of the anxiety of a pilot who still has to finish a strip with only 20% battery left.
News from the field
The rest of the fieldwork went as planned.
We skipped lunch, eating snack bars on the move, and ran a lot.
Time was short.
The area was large, and so were the kilometres to cover.
Surveys in winter
There was also the “winter” effect to consider.
A survey like this, given photogrammetry’s limits with vegetation, had to be done before spring.
Before the leaves came back.
And winter is the best season.
The trees are bare and the photos give you a better chance of getting good ground data.
Especially with beeches.
But winter days are short.
And if you’re on a mountain 2 km along a path from the car, you start looking at your watch at 4 pm and don’t wait long before deciding to head back.
You certainly have more time to download and back up the data, sit down and review the day, check and pre-process the data.
But you have less time in the field.
Watch your memory card!
During the flights there was a mishap with one of the drone’s memory cards.
I lost it!
At the end of a mission I took it out to change it, but the drone “spat” it out and the micro SD fell to the ground.
Normally that wouldn’t have been a big problem.
I’d have picked it up.
Blown on it like a child who drops a sweet.
And put it back in its slot.
But in that case “the ground” meant a tangle of dry bracken, and the card vanished among the stems, the leaves and the darkness below, with no chance of recovery.
Photos lost! 🙁
Here too there was an upside and a downside.
The downside is that I lost all the photos on the card.
Not great!
The upside is that, at least, they were the photos of a single mission.
I’m fairly paranoid about data and images.
I have lots of medium-capacity cards (16 GB/32 GB) and change them often during the flights.
I always think: “if something happens to the drone, at least I won’t lose the whole day’s data”.
So it was a matter of redoing the lost mission.
I lost some time, though, and above all a battery.
Lost in the sense that I had to spend an extra one to redo the mission I’d just finished.
Given that over large areas there are lots of flights (I did 12!), that wasn’t trivial.
Now I’ve learnt that, in risky situations, it’s always best to change the card over a “safe” surface.
Sometimes I put the drone on a 1×1 m PVC target.
It makes a good mat to catch a dropped card.
It isn’t 100% guaranteed, but it’s better than nothing.
Block shooting with no memory card in the camera
A setting that saved me on another occasion was “block shooting when there’s no memory card”.
I’d already run into this other times.
And I’d learnt my lesson.
I’d send the drone up, take the photos, and then realise I hadn’t inserted the memory card and had only wasted battery.
Batteries are time.
Time is work.
And work is money.
It isn’t very poetic, but that’s how it is…
Since those times (yes, more than one), I’ve set all my cameras, drones and flight apps on all my control devices (tablets and smartphones) so that the camera won’t shoot without a memory card inserted.
During this survey too, once, I sent the drone up without a card.
Distraction is always around the corner, especially when you have lots of other things to think about.
But with shooting blocked I noticed immediately and lost only the few minutes of battery needed to return and take off again.
Seriously consider using this setting on your cameras and drones too!
Backup in the field
After a two-day survey, measuring ground points and taking thousands of photos (almost 2,000), I find it essential to back up the data immediately, in the field.
I always bring my laptop, and at the end of each day I download the data to its internal drive and to two other separate external drives.
This gives me peace of mind about storage and lets me format the memory cards without worry during the next day’s acquisitions.

Work safely
My last thought on the fieldwork concerns safety.
Being two people in somewhat remote places, far from roads, with poor phone coverage and in rough terrain, is definitely safer.
I’m used to working alone.
And I quite like it.
Especially out in nature (with the phone silent for hours).
But I realise these things shouldn’t be taken lightly.
Even a trivial incident can be dangerous, and with two people the risk is reduced.
These are all aspects to consider and deal with.
“Safety first” may sound like a trite, simplistic slogan, but it’s the truth.

Data processing
Back in the office came the data processing.
Here things get less adventurous, less poetic and not at all wild.
It was a matter of taking photos and measurements and mixing everything in the photogrammetry software.
I don’t think there’s much more to say than what you may already have read in other posts and articles.
But so as not to leave gaps in the story, here’s a summary.
I processed the GNSS measurements of the targets with the Convergo software and the grids (one was enough) of IGM, Italy’s national mapping agency, to get solid output data (Easting, Northing, orthometric height) in the target reference system (Roma40 – Gauss-Boaga – EPSG 3003).
I used the SfM software Agisoft Metashape Pro to process the data.
First it aligned the images, then it optimised the alignment (the sparse cloud points) with the ground control points (GCPs), and then it created the dense point cloud, scaled, oriented and georeferenced.
It also calculated the accuracy on the check points (CPs), with a statistical analysis of the root mean square errors.
I took the txt file of the dense point cloud into LiDAR360 to process it and classify the ground points, separating them from the vegetation.
That would be the really important data.
LiDAR360’s classification algorithm did a really excellent job.
Even among the beeches!
The ground points appeared, almost magically, at the end of the (fairly long) calculation.
Afterwards I spent only a little more time refining the already excellent classification.
This is a screenshot of the raw cloud.

And this is the ground points result after LiDAR360’s ground classification algorithm:

The algorithm is very robust, but it doesn’t work magic.
If the survey had been done in late spring, I’m sure it would have extracted very little ground data compared with the “winter” dataset.
From the ground point cloud, moving between LiDAR360 and CloudCompare, I generated a digital terrain model, interpolated in the gaps, fully comparable to a 1×1 m DTM (Digital Terrain Model), from which I derived the contour lines (at 1 m intervals) and the point cloud of evenly spaced points on a regular grid.
In Metashape I generated an orthophoto of the whole area.
Then I brought orthophoto + points + contour lines into CAD (I use BricsCAD Pro), where I finished and tidied everything before delivering the work.
I integrated the plan into the regional technical map, downloaded from the Tuscany regional geoportal (Geoscopio).

Finally, the delivery happened on two “levels”.
All the data were delivered in the required file formats, and we also uploaded them online for immediate exploration and querying with web tools.
Specifically, I use Sketchfab to upload a 3D model made of mesh + texture, and Potree, a tool that converts a las point cloud into a set of files that can be explored on the web, letting the client inspect and measure the point cloud and make some exports.
Just to show you what it’s about, here’s the link to a model on Sketchfab.
It isn’t the subject of the survey in this story.
As I wrote earlier, I can’t reveal much more.
And I certainly can’t let you query the output point cloud.
Here’s the link to the model on Sketchfab (a model that has nothing to do with the survey in this story).
Files delivered and job done!
The end
And here we are at the end of this story.
I hope it was interesting.
If it was heavy going, let me know!
Your feedback helps me write better articles for you.
Length, form and content aside, I hope what you’ve read helps and encourages you to consider using drones and (aerial) photogrammetric techniques in settings like the one I’ve described.
I’m finishing this story two months after starting it.
Apart from the final corrections and revisions, I’m writing the last words from a makeshift portable office under a beach umbrella, on a sun lounger, typing on a tablet with a Bluetooth keyboard.
Needs must!
🙂
If you’re curious or have questions about this survey, get in touch.
Don’t be shy.
I’ve surely left out parts and details that, if they come to mind, could answer other people’s questions too.
A huge thank-you for the trust, the support, the company and the great days in the field to the wonderful Gianluca Dal Bianco and to Italsabi!

Before we go!
Send me a message or a voice note on Telegram: you’ll find me as @paolocorradeghini. Or write to me from the contact page.
Now it really is the end.
For now…
Thanks for your time and attention!
See you soon!
Paolo Corradeghini