Number your river cross-sections in multiples of 10

A small habit that saves trouble: number hydraulic cross-sections in multiples of 10, so you can always add new ones later.

When you deliver hydraulic cross-sections (perpendicular to the direction of flow of a watercourse), give them numbers that are multiples of 10.
That way you can always add new ones without wrecking the numbering you have already set.

Usually the section names follow the flow, in one direction or the other.
I start upstream and work downstream.
Most hydraulic modelling software prefers to go from downstream to upstream.
Your call.
Either way, they also end up in order along the longitudinal profile of the channel.

Cross-sections along a watercourse

If you use sequential numbering, 1, 2, 3, … and need to add something between sections 2 and 3 (because you have to add to the field survey, or because you want to extract something else from a continuous 3D model), it can be a pain.

With multiples of 10 you can slip a new section 25 between 20 and 30 painlessly.

OK, this is not a post that changes the world of surveying and river modelling, nor something that could invalidate a topographic survey, but I’m happy to share it anyway, hoping it saves you from “the first time you realise you didn’t think about the section numbering”.

A cross-section drawn from the survey