You can use a total station to “carry” an elevation from one point to another.
Or to several others…

The best way to measure height differences (and so elevations, if you know at least one) is levelling.
Digital levels reach sub-millimetre precision, and the way the measurement is taken helps limit instrument errors.
But you need a level…
🙂

Leica digital levelStaff for levelling from the middle

A total station (generally) reaches millimetre precision and lends itself to this job (not to measuring the deformation of a bridge during a load test!).
It can be done, as long as you pay attention to a few things.

Run a traverse

To measure the elevations of several points in a complex place you need to move the instrument, and it is best done with a traverse, where each station is tied to the previous and the next one, transferring the elevations.

Close it

At the end of a traverse you find out how well you did by reading the misclosure, which you can spread across the traverse stations by adjusting it.

Measure with a prism

While all total stations let you measure with and without a prism, it is better to shoot the points (whose elevation you want) with a prism on a pole (levelled and steadied at least with a bipod).

Robotic/motorised station

An instrument with automatic prism lock removes (or at least tries to) the error of the operator who has to sight through the telescope.
(Unfortunately) these instruments cost more…

Trimble SX10 total station

Don’t overdo the sights

The Earth is not flat (even though some people claim it is…) and height difference measurements suffer a lot from this.
For sub-centimetre precision, keep the “station-to-prism” and “station-to-station” distances to about 100-120 m.

Don’t measure the instrument height

Every time you measure the instrument height at a traverse station you risk making an error that, by the end of the loop, may not be negligible.
So it is better to use a forced centring kit (one that talks to your total station), so you don’t have to measure anything (instrument height = 0) and avoid that risk…

Trimble forced centring kit

There’s more than the elevation

Unlike a level, a total station, if you oriented it correctly at the start, also measures the horizontal position (x,y) of the points you survey, instead of stopping at the elevation alone.

Specific applications

The total station’s onboard software may have specific applications that let you use the instrument like a level, moving it as if you were levelling from the middle.
Have a look…

P.S.
Even with a level you can’t overdo the sight lengths.
For precise levelling, the maximum distance between instrument and staff should not exceed about 60 m.